Solar power plant · Valencia, NM
Rio De Oro Solar Energy Center
Rio De Oro Solar Energy Center is a 10 MW solar power plant in Valencia County, New Mexico, operated by PNM Resources. Its oldest generator still running came online in 2019. In 2025 it generated 28 GWh, about what 3,700 average New Mexico homes use in a year.
Rio De Oro Solar Energy Center in context
Among the 111 solar plants in New Mexico in the EIA's inventory, it is the 44th largest, about 0.3% of the state's 3.8 GW of solar capacity.
Valencia County has 14 power plants of 1 MW or more with 621 MW in all; Rio De Oro Solar Energy Center is 2% of that and the 5th largest of 11 solar plants there.
Its capacity factor of 32% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Valencia County goes 3.8 hours a year without power, the 7th most of 20 counties in New Mexico. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Rio De Oro Solar Energy Center (outlined) and other plants in Valencia County, shaded. 34.692, -106.688.
Plant facts
- Operator
- PNM Resources
- Sector
- Electric Utility
- Grid operator
- PNM
- County
- Valencia County, NM
- EIA plant ID
- 62597
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| RDO | Solar Photovoltaic | 10 MW | 2019 | – |
Nearby
Other plants in Valencia County
Questions
Rio De Oro Solar Energy Center, answered
How much power does Rio De Oro Solar Energy Center produce?
Rio De Oro Solar Energy Center has 10 MW of capacity from one generator. In 2025 it generated 28 GWh, 32% of the most it could have made running flat out all year (its capacity factor).
How many homes does Rio De Oro Solar Energy Center power?
Its 2025 output of 28 GWh equals the yearly electricity use of about 3,700 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Rio De Oro Solar Energy Center?
Rio De Oro Solar Energy Center is in Valencia County, New Mexico, at about 34.692°, -106.688°. It is one of 14 power plants of 1 MW or more in the county. The average electricity customer in Valencia County goes 3.8 hours a year without power, the 7th most of 20 counties in New Mexico. The county's page has the full outage record.
Who operates Rio De Oro Solar Energy Center?
It is operated by PNM Resources (EIA sector: Electric Utility), and it feeds balancing authority PNM.
When did Rio De Oro Solar Energy Center open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average New Mexico home's 638 kWh a month in 2025. Methodology.