Wind power plant · Lincoln, NM

SunZia Wind South

SunZia Wind South is a 2.6 GW wind power plant in Lincoln County, New Mexico, operated by Pattern Operators LP. Its oldest generator still running came online in 2026. In 2025 it generated 108 GWh, about what 14,000 average New Mexico homes use in a year.

Capacity2.6 GWNameplate, September 2026
Generated108 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2026

SunZia Wind South in context

Among the 31 wind plants in New Mexico in the EIA's inventory, it is the largest, about 32% of the state's 8.1 GW of wind capacity.

Lincoln County has 5 power plants of 1 MW or more with 3.3 GW in all; SunZia Wind South is 78% of that and the largest of 4 wind plants there.

The average electricity customer in Lincoln County goes 24 hours a year without power, the 1st most of 20 counties in New Mexico. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

SunZia Wind South (outlined) and other plants in Lincoln County, shaded. 34.352, -105.593.

Plant facts

Operator
Pattern Operators LP
Sector
IPP Non-CHP
Grid operator
CISO
County
Lincoln County, NM
EIA plant ID
66923
Where New Mexico's power comes from → New Mexico power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SZW-S Onshore Wind Turbine 2.6 GW 2026 –

Nearby

Other plants in Lincoln County

Questions

SunZia Wind South, answered

How much power does SunZia Wind South produce?

SunZia Wind South has 2.6 GW of capacity from one generator. In 2025 it generated 108 GWh.

How many homes does SunZia Wind South power?

Its 2025 output of 108 GWh equals the yearly electricity use of about 14,000 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is SunZia Wind South?

SunZia Wind South is in Lincoln County, New Mexico, at about 34.352°, -105.593°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Lincoln County goes 24 hours a year without power, the 1st most of 20 counties in New Mexico. The county's page has the full outage record.

Who operates SunZia Wind South?

It is operated by Pattern Operators LP (EIA sector: IPP Non-CHP), and it feeds the California ISO.

When did SunZia Wind South open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average New Mexico home's 638 kWh a month in 2025. Methodology.