Natural gas power plant · Sandoval, NM
Algodones
Algodones is a 45 MW natural gas power plant in Sandoval County, New Mexico, operated by Public Service Co of NM. Its oldest generator still running came online in 1954.
Algodones in context
Among the 19 natural gas plants in New Mexico in the EIA's inventory, it is the 15th largest, about 1.2% of the state's 3.7 GW of natural gas capacity.
Sandoval County has 12 power plants of 1 MW or more with 472 MW in all; Algodones is 10% of that.
The average electricity customer in Sandoval County goes 3.6 hours a year without power, the 10th most of 20 counties in New Mexico. The county's page has the full outage record.
Where it is
Algodones (outlined) and other plants in Sandoval County, shaded. 35.384, -106.464.
Plant facts
- Operator
- Public Service Co of NM
- Sector
- Electric Utility
- Grid operator
- PNM
- County
- Sandoval County, NM
- EIA plant ID
- 2475
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Natural Gas Steam Turbine | 15 MW | 1954 | – |
| 2 | Natural Gas Steam Turbine | 15 MW | 1954 | – |
| 3 | Natural Gas Steam Turbine | 15 MW | 1959 | – |
Nearby
Other plants in Sandoval County
Questions
Algodones, answered
How much power does Algodones produce?
Algodones has 45 MW of capacity from 3 generators. No full year of generation is reported yet.
Where is Algodones?
Algodones is in Sandoval County, New Mexico, at about 35.384°, -106.464°. It is one of 12 power plants of 1 MW or more in the county. The average electricity customer in Sandoval County goes 3.6 hours a year without power, the 10th most of 20 counties in New Mexico. The county's page has the full outage record.
Who operates Algodones?
It is operated by Public Service Co of NM (EIA sector: Electric Utility), and it feeds balancing authority PNM.
When did Algodones open?
Its oldest generator still running came online in 1954.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.