Solar power plant · Doña Ana, NM

Milagro Solar I

Milagro Solar I is a 225 MW solar power plant in Doña Ana County, New Mexico, operated by Milagro Solar I, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 279 GWh, about what 36,000 average New Mexico homes use in a year.

Capacity225 MWNameplate, September 2026
Generated279 GWhIn 2025
Capacity factor–Not a full year of data
Generators2Oldest from 2025

Milagro Solar I in context

Among the 111 solar plants in New Mexico in the EIA's inventory, it is the 5th largest, about 5.9% of the state's 3.8 GW of solar capacity.

Doña Ana County has 14 power plants of 1 MW or more with 1.1 GW in all; Milagro Solar I is 21% of that and the largest of 11 solar plants there.

The average electricity customer in Doña Ana County goes 2.4 hours a year without power, the 15th most of 20 counties in New Mexico. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Milagro Solar I (outlined) and other plants in Doña Ana County, shaded. 31.796, -106.642.

Plant facts

Operator
Milagro Solar I, LLC
Sector
IPP Non-CHP
Grid operator
EPE
County
Doña Ana County, NM
EIA plant ID
67528
  • Solar150 MW67%
  • Storage75 MW33%
Where New Mexico's power comes from → New Mexico power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MLRPV Solar Photovoltaic 150 MW 2025 –
MLRBS Batteries 75 MW · 300 MWh 2025 –

Nearby

Other plants in Doña Ana County

Questions

Milagro Solar I, answered

How much power does Milagro Solar I produce?

Milagro Solar I has 225 MW of capacity from 2 generators. In 2025 it generated 279 GWh.

How many homes does Milagro Solar I power?

Its 2025 output of 279 GWh equals the yearly electricity use of about 36,000 average New Mexico homes (638 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Milagro Solar I?

Milagro Solar I is in Doña Ana County, New Mexico, at about 31.796°, -106.642°. It is one of 14 power plants of 1 MW or more in the county. The average electricity customer in Doña Ana County goes 2.4 hours a year without power, the 15th most of 20 counties in New Mexico. The county's page has the full outage record.

Who operates Milagro Solar I?

It is operated by Milagro Solar I, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority EPE.

When did Milagro Solar I open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average New Mexico home's 638 kWh a month in 2025. Methodology.