Solar power plant · Doña Ana, NM

Santa Teresa Solar

Santa Teresa Solar is a 150 MW solar power plant in Doña Ana County, New Mexico, operated by Santa Teresa Solar. Its oldest generator still running came online in 2026.

Capacity150 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Santa Teresa Solar in context

Among the 111 solar plants in New Mexico in the EIA's inventory, it is the 10th largest, about 4.0% of the state's 3.8 GW of solar capacity.

Doña Ana County has 14 power plants of 1 MW or more with 1.1 GW in all; Santa Teresa Solar is 14% of that and the 2nd largest of 11 solar plants there.

The average electricity customer in Doña Ana County goes 2.4 hours a year without power, the 15th most of 20 counties in New Mexico. The county's page has the full outage record.

Where it is

Santa Teresa Solar (outlined) and other plants in Doña Ana County, shaded. 31.806, -106.699.

Plant facts

Operator
Santa Teresa Solar
Sector
IPP Non-CHP
Grid operator
EPE
County
Doña Ana County, NM
EIA plant ID
68866
Where New Mexico's power comes from → New Mexico power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
STS Solar Photovoltaic 150 MW 2026 –

Planned

GeneratorTechnologyCapacityExpected
SANBatteries150 MW2026

Nearby

Other plants in Doña Ana County

Questions

Santa Teresa Solar, answered

How much power does Santa Teresa Solar produce?

Santa Teresa Solar has 150 MW of capacity from one generator. No full year of generation is reported yet.

Where is Santa Teresa Solar?

Santa Teresa Solar is in Doña Ana County, New Mexico, at about 31.806°, -106.699°. It is one of 14 power plants of 1 MW or more in the county. The average electricity customer in Doña Ana County goes 2.4 hours a year without power, the 15th most of 20 counties in New Mexico. The county's page has the full outage record.

Who operates Santa Teresa Solar?

It is operated by Santa Teresa Solar (EIA sector: IPP Non-CHP), and it feeds balancing authority EPE.

When did Santa Teresa Solar open?

Its oldest generator still running came online in 2026. 1 more generator is planned.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.