Data centers · Montana

Data centers in Montana

12 operating data center sites, 2 projects planned or under construction.

Operating sites120 whole campuses
AI campuses0None tracked by Epoch AI
In the pipeline20 under construction, 2 planned
Home price13.0¢/kWh+19% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Quantica Infrastructure - Big Sky Digital Infrastructure Campus Quantica Infrastructure LLC Yellowstone Planned 1.1 GW 2030
Bitzero - Polson Facility Bitzero Lake Planned 50 MW –
Project Cardinal Data Center TAC Data Centers Cascade Cancelled 600 MW –
Sabey Data Centers - Butte Campus Sabey Data Centers Silver Bow Cancelled 250 MW –
Krambu - Bonner Data Center Krambu Inc. Missoula Cancelled 29 MW –
Marathon Digital - Hardin Facility Marathon Digital Holdings Big Horn Cancelled – –

Local pushback

Bans and moratoriums

3 recorded as enacted, 1 proposed or under review, 0 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Butte-Silver Bow · Silver Bow County Proposed Sep 2, 2026 Term not documented
Fort Peck Reservation · Roosevelt Tribal Enacted Aug 10, 2026 No end date by design — a permanent ban or standing statute
Missoula County · Missoula County Enacted Jul 9, 2026 to Jul 8, 2027
City of Missoula · Missoula City Enacted Mar 4, 2026 No end date by design — a permanent ban or standing statute

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Custer County30.6 h
Yellowstone County22.4 h
Deer Lodge County24.0 h
Granite County111 h
Missoula County17.7 h
Silver Bow County12.3 h
Big Horn County10.9 h
Lewis and Clark County14.4 h

Every named site

The list

11 of 12 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
State of Montana Data Center State of Montana Custer Building 0.2
Parsec Data Management – Yellowstone Point –
Cogent Billings Data Center Cogent Communications Yellowstone Operator's own list –
Cogent Missoula Edge Data Center Cogent Communications Missoula Operator's own list –
Bitpower - Data Center – Deer Lodge EPA record –
Bitpower Data Center – Deer Lodge EPA record –
Cryptowatt Mining Data Center – Silver Bow EPA record –
Liefern Data Center – Big Horn EPA record –
Zayo Group - Montana State Data Center Miles City – Custer EPA record –
Zayo Group - Montana State Data Center Miles City – Custer EPA record –
Glacier Bancorp Data Center – Lewis and Clark Overture place –

How many data centers are in Montana?

12 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 38th most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Montana?

0 under construction and 2 planned or announced in the Civic Returns and Server Country databases; the 2 that publish a size add up to about 1.1 GW. 4 projects have been cancelled.

Which Montana county has the most data centers?

Custer County, with 3 operating sites, then Yellowstone County (2) and Deer Lodge County (2).

Who operates data centers in Montana?

Among sites that name an operator: Cogent Communications (2), State of Montana (1).

What do Montana households pay for electricity?

13.0¢ per kWh on average in 2025 (US: 17.2¢), up 19% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.