Data centers · Idaho

Data centers in Idaho

8 operating data center sites, 4 projects planned or under construction and 1 AI campus planned to draw 198 MW.

Operating sites80 whole campuses
AI campuses1152 MW drawn now
In the pipeline42 under construction, 2 planned
Home price11.8¢/kWh+17% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

Idaho's AI data centers

CampusOwnerWhereNowPlanned
Meta KunaMetaAda County152 MW198 MW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
ValorC3 Data Centers - Boise Facility 2 ValorC3 Data Centers Ada Under construction 10 MW 2027
T5 Data Centers - Nampa T5 Data Centers Canyon Under construction 8 MW 2027
Deep Atomic INL Data Center Deep Atomic Bonneville Planned 60 MW 2028
Gemstone Technology Park Diode Ventures Ada Planned – –
Lex Developments Pocatello AI Data Center Lex Developments LLC Bannock Cancelled 100 MW –

Local pushback

Bans and moratoriums

3 recorded as enacted, 1 proposed or under review, 0 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Blaine County · Blaine Local Enacted Oct 1, 2026 A stated duration, but the end date isn't recorded here
Bannock County · Bannock County Enacted Jul 30, 2026 to Jan 26, 2027
Sandpoint · Bonner Local Proposed Jul 15, 2026 Term not documented
Kootenai County · Kootenai County Enacted Sep 25, 2025 No end date by design — a permanent ban or standing statute

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Ada County41.1 h
Madison County13.1 h
Bear Lake County14.2 h
Bannock County12.1 h
Kootenai County13.8 h

Every named site

The list

6 of 8 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
VentureData – Madison Building 0.4
Family History Center The Church of Jesus Christ of Latter-day Saints Bear Lake Building 0.1
Emerald Data Center – Ada EPA record –
Emerald Data Center (Tapani) – Ada EPA record –
Iccu Campus Expansion And Data Center – Bannock EPA record –
U S Bank Coeur D'Alene Data Center – Kootenai EPA record –

How many data centers are in Idaho?

8 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 41st most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Idaho?

2 under construction and 2 planned or announced in the Civic Returns and Server Country databases; the 3 that publish a size add up to about 78 MW, besides 1 AI campus tracked by Epoch AI. 1 project has been cancelled.

Which Idaho county has the most data centers?

Ada County, with 4 operating sites, then Madison County (1) and Bear Lake County (1).

Who operates data centers in Idaho?

Among sites that name an operator: The Church of Jesus Christ of Latter-day Saints (1).

What AI data centers are in Idaho?

Meta Kuna in Kuna (152 MW now, 198 MW planned), by Epoch AI's estimates.

What do Idaho households pay for electricity?

11.8¢ per kWh on average in 2025 (US: 17.2¢), up 17% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.