Data centers · Idaho
Data centers in Idaho
8 operating data center sites, 4 projects planned or under construction and 1 AI campus planned to draw 198 MW.
The map
Every mapped site
AI campuses
Idaho's AI data centers
| Campus | Owner | Where | Now | Planned |
|---|---|---|---|---|
| Meta Kuna | Meta | Ada County | 152 MW | 198 MW |
The pipeline
Projects on the way
From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.
| Project | Developer | County | Status | Announced size | Year |
|---|---|---|---|---|---|
| ValorC3 Data Centers - Boise Facility 2 | ValorC3 Data Centers | Ada | Under construction | 10 MW | 2027 |
| T5 Data Centers - Nampa | T5 Data Centers | Canyon | Under construction | 8 MW | 2027 |
| Deep Atomic INL Data Center | Deep Atomic | Bonneville | Planned | 60 MW | 2028 |
| Gemstone Technology Park | Diode Ventures | Ada | Planned | – | – |
| Lex Developments Pocatello AI Data Center | Lex Developments LLC | Bannock | Cancelled | 100 MW | – |
Local pushback
Bans and moratoriums
3 recorded as enacted, 1 proposed or under review, 0 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.
| Where | Level | Status | Date | Runs |
|---|---|---|---|---|
| Blaine County · Blaine | Local | Enacted | Oct 1, 2026 | A stated duration, but the end date isn't recorded here |
| Bannock County · Bannock | County | Enacted | Jul 30, 2026 | to Jan 26, 2027 |
| Sandpoint · Bonner | Local | Proposed | Jul 15, 2026 | Term not documented |
| Kootenai County · Kootenai | County | Enacted | Sep 25, 2025 | No end date by design — a permanent ban or standing statute |
By county
Where the data centers cluster
| County | Mapped sites | Hours without power a year |
|---|---|---|
| Ada County | 4 | 1.1 h |
| Madison County | 1 | 3.1 h |
| Bear Lake County | 1 | 4.2 h |
| Bannock County | 1 | 2.1 h |
| Kootenai County | 1 | 3.8 h |
Every named site
The list
6 of 8 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).
| Site | Operator | County | Source | Acres |
|---|---|---|---|---|
| VentureData | – | Madison | Building | 0.4 |
| Family History Center | The Church of Jesus Christ of Latter-day Saints | Bear Lake | Building | 0.1 |
| Emerald Data Center | – | Ada | EPA record | – |
| Emerald Data Center (Tapani) | – | Ada | EPA record | – |
| Iccu Campus Expansion And Data Center | – | Bannock | EPA record | – |
| U S Bank Coeur D'Alene Data Center | – | Kootenai | EPA record | – |
How many data centers are in Idaho?
8 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 41st most of any state. The map covers most large sites, not every server room, so the true number is higher.
How many data centers are being built in Idaho?
2 under construction and 2 planned or announced in the Civic Returns and Server Country databases; the 3 that publish a size add up to about 78 MW, besides 1 AI campus tracked by Epoch AI. 1 project has been cancelled.
Which Idaho county has the most data centers?
Ada County, with 4 operating sites, then Madison County (1) and Bear Lake County (1).
Who operates data centers in Idaho?
Among sites that name an operator: The Church of Jesus Christ of Latter-day Saints (1).
What AI data centers are in Idaho?
Meta Kuna in Kuna (152 MW now, 198 MW planned), by Epoch AI's estimates.
What do Idaho households pay for electricity?
11.8¢ per kWh on average in 2025 (US: 17.2¢), up 17% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.
Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.