Solar power plant · Yoakum, TX

1000 Mile Solar

1000 Mile Solar is a 300 MW solar power plant in Yoakum County, Texas, operated by 1000 Mile Solar, LLC. Its oldest generator still running came online in 2026.

Capacity300 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

1000 Mile Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 36th largest, about 0.8% of the state's 37 GW of solar capacity.

Yoakum County has 4 power plants of 1 MW or more with 1.3 GW in all; 1000 Mile Solar is 23% of that.

The average electricity customer in Yoakum County goes 3.5 hours a year without power, the 216th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

1000 Mile Solar (outlined) and other plants in Yoakum County, shaded. 33.022, -102.709.

Plant facts

Operator
1000 Mile Solar, LLC
Sector
IPP Non-CHP
Grid operator
SWPP
County
Yoakum County, TX
EIA plant ID
68847
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 300 MW 2026 –

Questions

1000 Mile Solar, answered

How much power does 1000 Mile Solar produce?

1000 Mile Solar has 300 MW of capacity from one generator. No full year of generation is reported yet.

Where is 1000 Mile Solar?

1000 Mile Solar is in Yoakum County, Texas, at about 33.022°, -102.709°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Yoakum County goes 3.5 hours a year without power, the 216th most of 240 counties in Texas. The county's page has the full outage record.

Who operates 1000 Mile Solar?

It is operated by 1000 Mile Solar, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.

When did 1000 Mile Solar open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.