Natural gas power plant · Kent, MI
Ada Cogeneration LP
Ada Cogeneration LP is a 33 MW natural gas power plant in Kent County, Michigan, operated by Ada Cogeneration LLC. Its oldest generator still running came online in 1990. In 2025 it generated 185 GWh, about what 24,000 average Michigan homes use in a year.
Ada Cogeneration LP in context
Among the 59 natural gas plants in Michigan in the EIA's inventory, it is the 33rd largest, about 0.2% of the state's 15 GW of natural gas capacity.
Kent County has 8 power plants of 1 MW or more with 72 MW in all; Ada Cogeneration LP is 46% of that and the largest of 2 natural gas plants there.
Its capacity factor of 64% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Kent County goes 7.5 hours a year without power, the 66th most of 83 counties in Michigan. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Ada Cogeneration LP (outlined) and other plants in Kent County, shaded. 42.963, -85.494.
Plant facts
- Operator
- Ada Cogeneration LLC
- Sector
- IPP CHP
- Grid operator
- MISO
- County
- Kent County, MI
- EIA plant ID
- 10819
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Natural Gas Fired Combined Cycle | 23 MW | 1990 | – |
| GEN2 | Natural Gas Fired Combined Cycle | 10 MW | 1990 | – |
Nearby
Other plants in Kent County
Questions
Ada Cogeneration LP, answered
How much power does Ada Cogeneration LP produce?
Ada Cogeneration LP has 33 MW of capacity from 2 generators. In 2025 it generated 185 GWh, 64% of the most it could have made running flat out all year (its capacity factor).
How many homes does Ada Cogeneration LP power?
Its 2025 output of 185 GWh equals the yearly electricity use of about 24,000 average Michigan homes (635 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Ada Cogeneration LP?
Ada Cogeneration LP is in Kent County, Michigan, at about 42.963°, -85.494°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Kent County goes 7.5 hours a year without power, the 66th most of 83 counties in Michigan. The county's page has the full outage record.
Who operates Ada Cogeneration LP?
It is operated by Ada Cogeneration LLC (EIA sector: IPP CHP), and it feeds MISO.
When did Ada Cogeneration LP open?
Its oldest generator still running came online in 1990.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Michigan home's 635 kWh a month in 2025. Methodology.