Adams Nielson Solar is a 19 MW solar power plant in Adams County, Washington, operated by Strata Manager, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 45 GWh, about what 3,900 average Washington homes use in a year.

Capacity19 MWNameplate, September 2026
Generated45 GWhIn 2025
Capacity factor27%Share of the most it could make, 2025
Generators1Oldest from 2018

Adams Nielson Solar in context

Among the 8 solar plants in Washington in the EIA's inventory, it is the 4th largest, about 5.5% of the state's 348 MW of solar capacity.

Adams County has 3 power plants of 1 MW or more with 169 MW in all; Adams Nielson Solar is 11% of that.

Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Adams County goes 1.5 hours a year without power, the 28th most of 31 counties in Washington. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0102030405020182019202020212022202320242025GWh 45
01020304050201920212023202545

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Adams Nielson Solar (outlined) and other plants in Adams County, shaded. 46.955, -118.621.

Plant facts

Operator
Strata Manager, LLC
Sector
IPP Non-CHP
Grid operator
AVA
County
Adams County, WA
EIA plant ID
61933
Where Washington's power comes from → Washington power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ADAMS Solar Photovoltaic 19 MW 2018 –

Nearby

Other plants in Adams County

Rattlesnake Flat · 144 MWRussell D Smith · 6.1 MW

Questions

Adams Nielson Solar, answered

How much power does Adams Nielson Solar produce?

Adams Nielson Solar has 19 MW of capacity from one generator. In 2025 it generated 45 GWh, 27% of the most it could have made running flat out all year (its capacity factor).

How many homes does Adams Nielson Solar power?

Its 2025 output of 45 GWh equals the yearly electricity use of about 3,900 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Adams Nielson Solar?

Adams Nielson Solar is in Adams County, Washington, at about 46.955°, -118.621°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Adams County goes 1.5 hours a year without power, the 28th most of 31 counties in Washington. The county's page has the full outage record.

Who operates Adams Nielson Solar?

It is operated by Strata Manager, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority AVA.

When did Adams Nielson Solar open?

Its oldest generator still running came online in 2018.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.