Solar power plant · Adams, WA
Adams Nielson Solar
Adams Nielson Solar is a 19 MW solar power plant in Adams County, Washington, operated by Strata Manager, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 45 GWh, about what 3,900 average Washington homes use in a year.
Adams Nielson Solar in context
Among the 8 solar plants in Washington in the EIA's inventory, it is the 4th largest, about 5.5% of the state's 348 MW of solar capacity.
Adams County has 3 power plants of 1 MW or more with 169 MW in all; Adams Nielson Solar is 11% of that.
Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Adams County goes 1.5 hours a year without power, the 28th most of 31 counties in Washington. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Adams Nielson Solar (outlined) and other plants in Adams County, shaded. 46.955, -118.621.
Plant facts
- Operator
- Strata Manager, LLC
- Sector
- IPP Non-CHP
- Grid operator
- AVA
- County
- Adams County, WA
- EIA plant ID
- 61933
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ADAMS | Solar Photovoltaic | 19 MW | 2018 | – |
Nearby
Other plants in Adams County
Questions
Adams Nielson Solar, answered
How much power does Adams Nielson Solar produce?
Adams Nielson Solar has 19 MW of capacity from one generator. In 2025 it generated 45 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Adams Nielson Solar power?
Its 2025 output of 45 GWh equals the yearly electricity use of about 3,900 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Adams Nielson Solar?
Adams Nielson Solar is in Adams County, Washington, at about 46.955°, -118.621°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Adams County goes 1.5 hours a year without power, the 28th most of 31 counties in Washington. The county's page has the full outage record.
Who operates Adams Nielson Solar?
It is operated by Strata Manager, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority AVA.
When did Adams Nielson Solar open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.