Wind power plant · De Witt, IL

Alta Farms II Wind Project, LLC

Alta Farms II Wind Project, LLC is a 201 MW wind power plant in De Witt County, Illinois, operated by Alta Farms II Wind Project, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 546 GWh, about what 64,000 average Illinois homes use in a year.

Capacity201 MWNameplate, September 2026
Generated546 GWhIn 2025
Capacity factor31%Share of the most it could make, 2025
Generators1Oldest from 2023

Alta Farms II Wind Project, LLC in context

Among the 56 wind plants in Illinois in the EIA's inventory, it is the 18th largest, about 2.3% of the state's 8.7 GW of wind capacity.

De Witt County has 7 power plants of 1 MW or more with 1.9 GW in all; Alta Farms II Wind Project, LLC is 11% of that and the 3rd largest of 3 wind plants there.

Its capacity factor of 31% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in De Witt County goes 11 hours a year without power, the 6th most of 101 counties in Illinois. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0200400600800202320242025GWh 546
0200400600800202320242025546

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Alta Farms II Wind Project, LLC (outlined) and other plants in De Witt County, shaded. 40.197, -89.068.

Plant facts

Operator
Alta Farms II Wind Project, LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
De Witt County, IL
EIA plant ID
64088
Where Illinois's power comes from → Illinois power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
WT2 Onshore Wind Turbine 201 MW 2023 –

Nearby

Other plants in De Witt County

Questions

Alta Farms II Wind Project, LLC, answered

How much power does Alta Farms II Wind Project, LLC produce?

Alta Farms II Wind Project, LLC has 201 MW of capacity from one generator. In 2025 it generated 546 GWh, 31% of the most it could have made running flat out all year (its capacity factor).

How many homes does Alta Farms II Wind Project, LLC power?

Its 2025 output of 546 GWh equals the yearly electricity use of about 64,000 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Alta Farms II Wind Project, LLC?

Alta Farms II Wind Project, LLC is in De Witt County, Illinois, at about 40.197°, -89.068°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in De Witt County goes 11 hours a year without power, the 6th most of 101 counties in Illinois. The county's page has the full outage record.

Who operates Alta Farms II Wind Project, LLC?

It is operated by Alta Farms II Wind Project, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Alta Farms II Wind Project, LLC open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.