Solar power plant · Jones, TX

ANSON Solar Center, LLC

ANSON Solar Center, LLC is a 200 MW solar power plant in Jones County, Texas, operated by Engie North America. Its oldest generator still running came online in 2021. In 2025 it generated 504 GWh, about what 38,000 average Texas homes use in a year.

Capacity200 MWNameplate, September 2026
Generated504 GWhIn 2025
Capacity factor29%Share of the most it could make, 2025
Generators1Oldest from 2021

ANSON Solar Center, LLC in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 80th largest, about 0.5% of the state's 37 GW of solar capacity.

Jones County has 2 power plants of 1 MW or more with 201 MW in all; ANSON Solar Center, LLC is 99% of that.

Its capacity factor of 29% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Jones County goes 13 hours a year without power, the 89th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060020212022202320242025GWh 504
020040060020212022202320242025504

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

ANSON Solar Center, LLC (outlined) and other plants in Jones County, shaded. 32.811, -99.917.

Plant facts

Operator
Engie North America
Sector
IPP Non-CHP
Grid operator
ERCO
County
Jones County, TX
EIA plant ID
64026
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
SF1 Solar Photovoltaic 200 MW 2021 –

Nearby

Other plants in Jones County

WAL536 · 1.2 MW

Questions

ANSON Solar Center, LLC, answered

How much power does ANSON Solar Center, LLC produce?

ANSON Solar Center, LLC has 200 MW of capacity from one generator. In 2025 it generated 504 GWh, 29% of the most it could have made running flat out all year (its capacity factor).

How many homes does ANSON Solar Center, LLC power?

Its 2025 output of 504 GWh equals the yearly electricity use of about 38,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is ANSON Solar Center, LLC?

ANSON Solar Center, LLC is in Jones County, Texas, at about 32.811°, -99.917°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Jones County goes 13 hours a year without power, the 89th most of 240 counties in Texas. The county's page has the full outage record.

Who operates ANSON Solar Center, LLC?

It is operated by Engie North America (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did ANSON Solar Center, LLC open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.