Solar power plant · Louisa, VA
Apple Grove Solar, LLC
Apple Grove Solar, LLC is a 19 MW solar power plant in Louisa County, Virginia, operated by Apple Grove Solar, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 30 GWh, about what 2,300 average Virginia homes use in a year.
Apple Grove Solar, LLC in context
Among the 144 solar plants in Virginia in the EIA's inventory, it is the 77th largest, about 0.4% of the state's 5.3 GW of solar capacity.
Louisa County has 7 power plants of 1 MW or more with 2.9 GW in all; Apple Grove Solar, LLC is 1% of that and the 3rd largest of 4 solar plants there.
Its capacity factor of 18% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Louisa County goes 16 hours a year without power, the 53rd most of 123 counties in Virginia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Apple Grove Solar, LLC (outlined) and other plants in Louisa County, shaded. 37.919, -77.862.
Plant facts
- Operator
- Apple Grove Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Louisa County, VA
- EIA plant ID
- 65224
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ENX15 | Solar Photovoltaic | 19 MW | 2023 | – |
Questions
Apple Grove Solar, LLC, answered
How much power does Apple Grove Solar, LLC produce?
Apple Grove Solar, LLC has 19 MW of capacity from one generator. In 2025 it generated 30 GWh, 18% of the most it could have made running flat out all year (its capacity factor).
How many homes does Apple Grove Solar, LLC power?
Its 2025 output of 30 GWh equals the yearly electricity use of about 2,300 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Apple Grove Solar, LLC?
Apple Grove Solar, LLC is in Louisa County, Virginia, at about 37.919°, -77.862°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Louisa County goes 16 hours a year without power, the 53rd most of 123 counties in Virginia. The county's page has the full outage record.
Who operates Apple Grove Solar, LLC?
It is operated by Apple Grove Solar, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Apple Grove Solar, LLC open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.