Solar power plant · Ford, IL

Archtop Solar

Archtop Solar is a 287 MW solar power plant in Ford County, Illinois, operated by Archtop Property Management LLC. Its oldest generator still running came online in 2026.

Capacity287 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators6Oldest from 2026

Archtop Solar in context

Among the 476 solar plants in Illinois in the EIA's inventory, it is the 3rd largest, about 4.9% of the state's 5.9 GW of solar capacity.

Ford County has 5 power plants of 1 MW or more with 867 MW in all; Archtop Solar is 33% of that and the largest of 2 solar plants there.

The average electricity customer in Ford County goes 3.8 hours a year without power, the 59th most of 101 counties in Illinois. The county's page has the full outage record.

Where it is

Archtop Solar (outlined) and other plants in Ford County, shaded. 40.469, -88.403.

Plant facts

Operator
Archtop Property Management LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Ford County, IL
EIA plant ID
69521
Where Illinois's power comes from → Illinois power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
ARCH1 Solar Photovoltaic 61 MW 2026 –
ARCH6 Solar Photovoltaic 61 MW 2026 –
ARCH2 Solar Photovoltaic 53 MW 2026 –
ARCH5 Solar Photovoltaic 49 MW 2026 –
ARCH3 Solar Photovoltaic 37 MW 2026 –
ARCH4 Solar Photovoltaic 25 MW 2026 –

Nearby

Other plants in Ford County

Questions

Archtop Solar, answered

How much power does Archtop Solar produce?

Archtop Solar has 287 MW of capacity from 6 generators. No full year of generation is reported yet.

Where is Archtop Solar?

Archtop Solar is in Ford County, Illinois, at about 40.469°, -88.403°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Ford County goes 3.8 hours a year without power, the 59th most of 101 counties in Illinois. The county's page has the full outage record.

Who operates Archtop Solar?

It is operated by Archtop Property Management LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Archtop Solar open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.