Solar power plant · Lyon, KY

Ashwood Solar I

Ashwood Solar I is a 86 MW solar power plant in Lyon County, Kentucky, operated by RWE Americas, LLC. Its oldest generator still running came online in 2026.

Capacity86 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Ashwood Solar I in context

Among the 20 solar plants in Kentucky in the EIA's inventory, it is the 8th largest, about 6.3% of the state's 1.4 GW of solar capacity.

Lyon County has 2 power plants of 1 MW or more with 216 MW in all; Ashwood Solar I is 40% of that.

The average electricity customer in Lyon County goes 14 hours a year without power, the 30th most of 119 counties in Kentucky. The county's page has the full outage record.

Where it is

Ashwood Solar I (outlined) and other plants in Lyon County, shaded. 37.023, -88.081.

Plant facts

Operator
RWE Americas, LLC
Sector
IPP Non-CHP
Grid operator
LGEE
County
Lyon County, KY
EIA plant ID
67701
Where Kentucky's power comes from → Kentucky power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
AS1 Solar Photovoltaic 86 MW 2026 –

Nearby

Other plants in Lyon County

Questions

Ashwood Solar I, answered

How much power does Ashwood Solar I produce?

Ashwood Solar I has 86 MW of capacity from one generator. No full year of generation is reported yet.

Where is Ashwood Solar I?

Ashwood Solar I is in Lyon County, Kentucky, at about 37.023°, -88.081°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Lyon County goes 14 hours a year without power, the 30th most of 119 counties in Kentucky. The county's page has the full outage record.

Who operates Ashwood Solar I?

It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority LGEE.

When did Ashwood Solar I open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.