Solar power plant · Iowa, WI

Badger Hollow II

Badger Hollow II is a 150 MW solar power plant in Iowa County, Wisconsin, operated by Wisconsin Electric Power Co. Its oldest generator still running came online in 2023. In 2025 it generated 206 GWh, about what 26,000 average Wisconsin homes use in a year.

Capacity150 MWNameplate, September 2026
Generated206 GWhIn 2025
Capacity factor16%Share of the most it could make, 2025
Generators1Oldest from 2023

Badger Hollow II in context

Among the 116 solar plants in Wisconsin in the EIA's inventory, it is the 7th largest, about 5.3% of the state's 2.8 GW of solar capacity.

Iowa County has 3 power plants of 1 MW or more with 330 MW in all; Badger Hollow II is 45% of that and the 2nd largest of 2 solar plants there.

Its capacity factor of 16% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Iowa County goes 3.3 hours a year without power, the 29th most of 72 counties in Wisconsin. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

050100150200250202320242025GWh 206
050100150200250202320242025206

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Badger Hollow II (outlined) and other plants in Iowa County, shaded. 42.946, -90.349.

Plant facts

Operator
Wisconsin Electric Power Co
Sector
Electric Utility
Grid operator
MISO
County
Iowa County, WI
EIA plant ID
64393
Where Wisconsin's power comes from → Wisconsin power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN2 Solar Photovoltaic 150 MW 2023 –

Questions

Badger Hollow II, answered

How much power does Badger Hollow II produce?

Badger Hollow II has 150 MW of capacity from one generator. In 2025 it generated 206 GWh, 16% of the most it could have made running flat out all year (its capacity factor).

How many homes does Badger Hollow II power?

Its 2025 output of 206 GWh equals the yearly electricity use of about 26,000 average Wisconsin homes (667 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Badger Hollow II?

Badger Hollow II is in Iowa County, Wisconsin, at about 42.946°, -90.349°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Iowa County goes 3.3 hours a year without power, the 29th most of 72 counties in Wisconsin. The county's page has the full outage record.

Who operates Badger Hollow II?

It is operated by Wisconsin Electric Power Co (EIA sector: Electric Utility), and it feeds MISO.

When did Badger Hollow II open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Wisconsin home's 667 kWh a month in 2025. Methodology.