Solar power plant · Rains, TX
Barrett Solar Project
Barrett Solar Project is a 125 MW solar power plant in Rains County, Texas, operated by Barrett Solar Project LLC (RE). Its oldest generator still running came online in 2026.
Barrett Solar Project in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 128th largest, about 0.3% of the state's 37 GW of solar capacity.
The average electricity customer in Rains County goes 6.0 hours a year without power, the 181st most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Barrett Solar Project (outlined) and other plants in Rains County, shaded. 32.952, -95.903.
Plant facts
- Operator
- Barrett Solar Project LLC (RE)
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Rains County, TX
- EIA plant ID
- 69359
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BARS1 | Solar Photovoltaic | 125 MW | 2026 | – |
Questions
Barrett Solar Project, answered
How much power does Barrett Solar Project produce?
Barrett Solar Project has 125 MW of capacity from one generator. No full year of generation is reported yet.
Where is Barrett Solar Project?
Barrett Solar Project is in Rains County, Texas, at about 32.952°, -95.903°. The average electricity customer in Rains County goes 6.0 hours a year without power, the 181st most of 240 counties in Texas. The county's page has the full outage record.
Who operates Barrett Solar Project?
It is operated by Barrett Solar Project LLC (RE) (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Barrett Solar Project open?
Its oldest generator still running came online in 2026.