Storage power plant · Fairbanks North Star, AK

Battery Energy Storage System

Battery Energy Storage System is a 40 MW storage power plant in Fairbanks North Star Borough, Alaska, operated by Golden Valley Elec Assn Inc. Its oldest generator still running came online in 2003.

Capacity40 MWNameplate, September 2026
Net energy-3.7 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2003

Battery Energy Storage System in context

Among the 5 storage plants in Alaska in the EIA's inventory, it is the largest, about 47% of the state's 86 MW of storage capacity.

Fairbanks North Star Borough has 7 power plants of 1 MW or more with 386 MW in all; Battery Energy Storage System is 10% of that.

The average electricity customer in Fairbanks North Star Borough goes 7.9 hours a year without power, the 5th most of 6 counties in Alaska. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.

000111120182019202020212022202320242025GWh -4
00011112019202120232025-4

Where it is

Battery Energy Storage System (outlined) and other plants in Fairbanks North Star Borough, shaded. 64.817, -147.725.

Plant facts

Operator
Golden Valley Elec Assn Inc
Sector
Electric Utility
Grid operator
NA
County
Fairbanks North Star Borough, AK
EIA plant ID
57583
Where Alaska's power comes from → Alaska power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BESS Batteries 40 MW · 11 MWh 2003 –

Questions

Battery Energy Storage System, answered

How much can Battery Energy Storage System store and deliver?

Battery Energy Storage System can deliver up to 40 MW and hold 11 MWh of energy, from one battery or storage system. Its net energy in 2025 was -3.7 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.

Where is Battery Energy Storage System?

Battery Energy Storage System is in Fairbanks North Star Borough, Alaska, at about 64.817°, -147.725°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Fairbanks North Star Borough goes 7.9 hours a year without power, the 5th most of 6 counties in Alaska. The county's page has the full outage record.

Who operates Battery Energy Storage System?

It is operated by Golden Valley Elec Assn Inc (EIA sector: Electric Utility), and it feeds balancing authority NA.

When did Battery Energy Storage System open?

Its oldest generator still running came online in 2003.