Solar power plant · Humboldt, NV
Battle Mountain Solar Project
Battle Mountain Solar Project is a 126 MW solar power plant in Humboldt County, Nevada, operated by RWE Americas, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 272 GWh, about what 26,000 average Nevada homes use in a year.
Battle Mountain Solar Project in context
Among the 58 solar plants in Nevada in the EIA's inventory, it is the 16th largest, about 2.0% of the state's 6.2 GW of solar capacity.
Humboldt County has 3 power plants of 1 MW or more with 738 MW in all; Battle Mountain Solar Project is 17% of that.
Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Humboldt County goes 8.0 hours a year without power, the 4th most of 12 counties in Nevada. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Battle Mountain Solar Project (outlined) and other plants in Humboldt County, shaded. 40.718, -117.061.
Plant facts
- Operator
- RWE Americas, LLC
- Sector
- IPP Non-CHP
- Grid operator
- NEVP
- County
- Humboldt County, NV
- EIA plant ID
- 61098
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BMSP | Solar Photovoltaic | 101 MW | 2021 | – |
| BMBS | Batteries | 25 MW · 25 MWh | 2021 | – |
Nearby
Other plants in Humboldt County
Questions
Battle Mountain Solar Project, answered
How much power does Battle Mountain Solar Project produce?
Battle Mountain Solar Project has 126 MW of capacity from 2 generators. In 2025 it generated 272 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Battle Mountain Solar Project power?
Its 2025 output of 272 GWh equals the yearly electricity use of about 26,000 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Battle Mountain Solar Project?
Battle Mountain Solar Project is in Humboldt County, Nevada, at about 40.718°, -117.061°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Humboldt County goes 8.0 hours a year without power, the 4th most of 12 counties in Nevada. The county's page has the full outage record.
Who operates Battle Mountain Solar Project?
It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds NV Energy.
When did Battle Mountain Solar Project open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.