Solar power plant · Morehouse, LA
Bayou Galion Solar Project
Bayou Galion Solar Project is a 98 MW solar power plant in Morehouse Parish, Louisiana, operated by Bayou Galion Solar Project, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 230 GWh, about what 16,000 average Louisiana homes use in a year.
Bayou Galion Solar Project in context
Among the 21 solar plants in Louisiana in the EIA's inventory, it is the 8th largest, about 6.3% of the state's 1.6 GW of solar capacity.
Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Morehouse Parish goes 14 hours a year without power, the 52nd most of 63 counties in Louisiana. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Bayou Galion Solar Project (outlined) and other plants in Morehouse Parish, shaded. 32.798, -91.784.
Plant facts
- Operator
- Bayou Galion Solar Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Morehouse Parish, LA
- EIA plant ID
- 67104
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BAYOU | Solar Photovoltaic | 98 MW | 2024 | – |
Questions
Bayou Galion Solar Project, answered
How much power does Bayou Galion Solar Project produce?
Bayou Galion Solar Project has 98 MW of capacity from one generator. In 2025 it generated 230 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Bayou Galion Solar Project power?
Its 2025 output of 230 GWh equals the yearly electricity use of about 16,000 average Louisiana homes (1,225 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Bayou Galion Solar Project?
Bayou Galion Solar Project is in Morehouse Parish, Louisiana, at about 32.798°, -91.784°. The average electricity customer in Morehouse Parish goes 14 hours a year without power, the 52nd most of 63 counties in Louisiana. The county's page has the full outage record.
Who operates Bayou Galion Solar Project?
It is operated by Bayou Galion Solar Project, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Bayou Galion Solar Project open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Louisiana home's 1,225 kWh a month in 2025. Methodology.