Wind power plant · Boone, IA

Beaver Creek Wind

Beaver Creek Wind is a 340 MW wind power plant in Boone County, Iowa, operated by MidAmerican Energy Co. Its oldest generator still running came online in 2017. In 2025 it generated 1.3 TWh, about what 122,000 average Iowa homes use in a year.

Capacity340 MWNameplate, September 2026
Generated1.3 TWhIn 2025
Capacity factor42%Share of the most it could make, 2025
Generators2Oldest from 2017

Beaver Creek Wind in context

Among the 123 wind plants in Iowa in the EIA's inventory, it is the 4th largest, about 2.5% of the state's 13 GW of wind capacity.

Boone County has 4 power plants of 1 MW or more with 348 MW in all; Beaver Creek Wind is 98% of that and the largest of 2 wind plants there.

Its capacity factor of 42% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Boone County goes 8.7 hours a year without power, the 14th most of 98 counties in Iowa. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05001,0001,5002,00020182019202020212022202320242025GWh 1,258
05001,0001,5002,00020192021202320251,258

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Beaver Creek Wind (outlined) and other plants in Boone County, shaded. 42.107, -94.165.

Plant facts

Operator
MidAmerican Energy Co
Sector
Electric Utility
Grid operator
MISO
County
Boone County, IA
EIA plant ID
61079
Where Iowa's power comes from → Iowa power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 170 MW 2017 –
GT1 Onshore Wind Turbine 170 MW 2018 –

Nearby

Other plants in Boone County

Ogden · 3.9 MWMichelangelo Wind 4 LLC · 3.0 MWFareway Customer Hosted 1 MW Solar · 1.0 MW

Questions

Beaver Creek Wind, answered

How much power does Beaver Creek Wind produce?

Beaver Creek Wind has 340 MW of capacity from 2 generators. In 2025 it generated 1.3 TWh, 42% of the most it could have made running flat out all year (its capacity factor).

How many homes does Beaver Creek Wind power?

Its 2025 output of 1.3 TWh equals the yearly electricity use of about 122,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Beaver Creek Wind?

Beaver Creek Wind is in Boone County, Iowa, at about 42.107°, -94.165°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Boone County goes 8.7 hours a year without power, the 14th most of 98 counties in Iowa. The county's page has the full outage record.

Who operates Beaver Creek Wind?

It is operated by MidAmerican Energy Co (EIA sector: Electric Utility), and it feeds MISO.

When did Beaver Creek Wind open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.