Wind power plant · Stillwater, MT

Beaver Creek Wind Facility

Beaver Creek Wind Facility is a 248 MW wind power plant in Stillwater County, Montana, operated by Puget Sound Energy Inc. Its oldest generator still running came online in 2025. In 2025 it generated 161 GWh, about what 16,000 average Montana homes use in a year.

Capacity248 MWNameplate, September 2026
Generated161 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Beaver Creek Wind Facility in context

Among the 23 wind plants in Montana in the EIA's inventory, it is the 2nd largest, about 12% of the state's 2.1 GW of wind capacity.

Stillwater County has 4 power plants of 1 MW or more with 342 MW in all; Beaver Creek Wind Facility is 73% of that and the largest of 2 wind plants there.

The average electricity customer in Stillwater County goes 2.0 hours a year without power, the 33rd most of 35 counties in Montana. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Beaver Creek Wind Facility (outlined) and other plants in Stillwater County, shaded. 45.956, -109.497.

Plant facts

Operator
Puget Sound Energy Inc
Sector
Electric Utility
Grid operator
NWMT
County
Stillwater County, MT
EIA plant ID
65019
Where Montana's power comes from → Montana power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BCW1 Onshore Wind Turbine 248 MW 2025 –

Nearby

Other plants in Stillwater County

Stillwater Wind, LLC · 80 MWMystic · 12 MWRiver Bend Solar, LLC (MT) · 2.0 MW

Questions

Beaver Creek Wind Facility, answered

How much power does Beaver Creek Wind Facility produce?

Beaver Creek Wind Facility has 248 MW of capacity from one generator. In 2025 it generated 161 GWh.

How many homes does Beaver Creek Wind Facility power?

Its 2025 output of 161 GWh equals the yearly electricity use of about 16,000 average Montana homes (853 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Beaver Creek Wind Facility?

Beaver Creek Wind Facility is in Stillwater County, Montana, at about 45.956°, -109.497°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Stillwater County goes 2.0 hours a year without power, the 33rd most of 35 counties in Montana. The county's page has the full outage record.

Who operates Beaver Creek Wind Facility?

It is operated by Puget Sound Energy Inc (EIA sector: Electric Utility), and it feeds balancing authority NWMT.

When did Beaver Creek Wind Facility open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Montana home's 853 kWh a month in 2025. Methodology.