Wind power plant · Bureau, IL
Big Sky Wind LLC
Big Sky Wind LLC is a 239 MW wind power plant in Bureau County, Illinois, operated by Big Sky Wind LLC. Its oldest generator still running came online in 2011. In 2025 it generated 817 GWh, about what 95,000 average Illinois homes use in a year.
Big Sky Wind LLC in context
Among the 56 wind plants in Illinois in the EIA's inventory, it is the 7th largest, about 2.8% of the state's 8.7 GW of wind capacity.
Bureau County has 15 power plants of 1 MW or more with 752 MW in all; Big Sky Wind LLC is 32% of that and the largest of 6 wind plants there.
Its capacity factor of 39% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Bureau County goes 5.8 hours a year without power, the 30th most of 101 counties in Illinois. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Big Sky Wind LLC (outlined) and other plants in Bureau County, shaded. 41.599, -89.456.
Plant facts
- Operator
- Big Sky Wind LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Bureau County, IL
- EIA plant ID
- 57135
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 239 MW | 2011 | – |
Nearby
Other plants in Bureau County
Questions
Big Sky Wind LLC, answered
How much power does Big Sky Wind LLC produce?
Big Sky Wind LLC has 239 MW of capacity from one generator. In 2025 it generated 817 GWh, 39% of the most it could have made running flat out all year (its capacity factor).
How many homes does Big Sky Wind LLC power?
Its 2025 output of 817 GWh equals the yearly electricity use of about 95,000 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Big Sky Wind LLC?
Big Sky Wind LLC is in Bureau County, Illinois, at about 41.599°, -89.456°. It is one of 15 power plants of 1 MW or more in the county. The average electricity customer in Bureau County goes 5.8 hours a year without power, the 30th most of 101 counties in Illinois. The county's page has the full outage record.
Who operates Big Sky Wind LLC?
It is operated by Big Sky Wind LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Big Sky Wind LLC open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.