Wind power plant · Sweet Grass, MT

Big Timber Wind Farm

Big Timber Wind Farm is a 25 MW wind power plant in Sweet Grass County, Montana, operated by RWE Americas, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 73 GWh, about what 7,200 average Montana homes use in a year.

Capacity25 MWNameplate, September 2026
Generated73 GWhIn 2025
Capacity factor34%Share of the most it could make, 2025
Generators1Oldest from 2018

Big Timber Wind Farm in context

Among the 23 wind plants in Montana in the EIA's inventory, it is the 16th largest, about 1.2% of the state's 2.1 GW of wind capacity.

Its capacity factor of 34% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Sweet Grass County goes 7.1 hours a year without power, the 16th most of 35 counties in Montana. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608010012020182019202020212022202320242025GWh 73
020406080100120201920212023202573

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Big Timber Wind Farm (outlined) and other plants in Sweet Grass County, shaded. 45.855, -109.649.

Plant facts

Operator
RWE Americas, LLC
Sector
IPP Non-CHP
Grid operator
NWMT
County
Sweet Grass County, MT
EIA plant ID
61155
Where Montana's power comes from → Montana power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BT-MT Onshore Wind Turbine 25 MW 2018 –

Questions

Big Timber Wind Farm, answered

How much power does Big Timber Wind Farm produce?

Big Timber Wind Farm has 25 MW of capacity from one generator. In 2025 it generated 73 GWh, 34% of the most it could have made running flat out all year (its capacity factor).

How many homes does Big Timber Wind Farm power?

Its 2025 output of 73 GWh equals the yearly electricity use of about 7,200 average Montana homes (853 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Big Timber Wind Farm?

Big Timber Wind Farm is in Sweet Grass County, Montana, at about 45.855°, -109.649°. The average electricity customer in Sweet Grass County goes 7.1 hours a year without power, the 16th most of 35 counties in Montana. The county's page has the full outage record.

Who operates Big Timber Wind Farm?

It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority NWMT.

When did Big Timber Wind Farm open?

Its oldest generator still running came online in 2018.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Montana home's 853 kWh a month in 2025. Methodology.