Wind power plant · Bailey, TX
Blue Cloud Wind Energy LLC
Blue Cloud Wind Energy LLC is a 148 MW wind power plant in Bailey County, Texas, operated by TC Energy. Its oldest generator still running came online in 2018. In 2025 it generated 564 GWh, about what 42,000 average Texas homes use in a year.
Blue Cloud Wind Energy LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 161st largest, about 0.3% of the state's 45 GW of wind capacity.
Its capacity factor of 43% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Bailey County goes 1.4 hours a year without power, the 238th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Blue Cloud Wind Energy LLC (outlined) and other plants in Bailey County, shaded. 34.038, -102.665.
Plant facts
- Operator
- TC Energy
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Bailey County, TX
- EIA plant ID
- 60270
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WT1 | Onshore Wind Turbine | 148 MW | 2018 | – |
Questions
Blue Cloud Wind Energy LLC, answered
How much power does Blue Cloud Wind Energy LLC produce?
Blue Cloud Wind Energy LLC has 148 MW of capacity from one generator. In 2025 it generated 564 GWh, 43% of the most it could have made running flat out all year (its capacity factor).
How many homes does Blue Cloud Wind Energy LLC power?
Its 2025 output of 564 GWh equals the yearly electricity use of about 42,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Blue Cloud Wind Energy LLC?
Blue Cloud Wind Energy LLC is in Bailey County, Texas, at about 34.038°, -102.665°. The average electricity customer in Bailey County goes 1.4 hours a year without power, the 238th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Blue Cloud Wind Energy LLC?
It is operated by TC Energy (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Blue Cloud Wind Energy LLC open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.