Wind power plant · Hardeman, TX
Blue Summit III Wind
Blue Summit III Wind is a 200 MW wind power plant in Hardeman County, Texas, operated by Blue Summit III Wind, LLC. Its oldest generator still running came online in 2019. In 2025 it generated 748 GWh, about what 56,000 average Texas homes use in a year.
Blue Summit III Wind in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 93rd largest, about 0.4% of the state's 45 GW of wind capacity.
Its capacity factor of 43% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Hardeman County goes 17 hours a year without power, the 51st most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Blue Summit III Wind (outlined) and other plants in Hardeman County, shaded. 34.170, -99.563.
Plant facts
- Operator
- Blue Summit III Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Hardeman County, TX
- EIA plant ID
- 62566
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BS3 | Onshore Wind Turbine | 200 MW | 2019 | – |
Questions
Blue Summit III Wind, answered
How much power does Blue Summit III Wind produce?
Blue Summit III Wind has 200 MW of capacity from one generator. In 2025 it generated 748 GWh, 43% of the most it could have made running flat out all year (its capacity factor).
How many homes does Blue Summit III Wind power?
Its 2025 output of 748 GWh equals the yearly electricity use of about 56,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Blue Summit III Wind?
Blue Summit III Wind is in Hardeman County, Texas, at about 34.170°, -99.563°. The average electricity customer in Hardeman County goes 17 hours a year without power, the 51st most of 240 counties in Texas. The county's page has the full outage record.
Who operates Blue Summit III Wind?
It is operated by Blue Summit III Wind, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Blue Summit III Wind open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.