Solar power plant · Queen Anne's, MD

Bluegrass Solar 2

Bluegrass Solar 2 is a 40 MW solar power plant in Queen Anne's County, Maryland, operated by MN8 Energy LLC. Its oldest generator still running came online in 2022. In 2025 it generated 76 GWh, about what 6,700 average Maryland homes use in a year.

Capacity40 MWNameplate, September 2026
Generated76 GWhIn 2025
Capacity factor22%Share of the most it could make, 2025
Generators1Oldest from 2022

Bluegrass Solar 2 in context

Among the 214 solar plants in Maryland in the EIA's inventory, it is the 8th largest, about 2.8% of the state's 1.4 GW of solar capacity.

Queen Anne's County has 9 power plants of 1 MW or more with 167 MW in all; Bluegrass Solar 2 is 24% of that and the 2nd largest of 9 solar plants there.

Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Queen Anne's County goes 2.1 hours a year without power, the 21st most of 24 counties in Maryland. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Bluegrass Solar 2 (outlined) and other plants in Queen Anne's County, shaded. 39.170, -75.959.

Plant facts

Operator
MN8 Energy LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
Queen Anne's County, MD
EIA plant ID
70211
Where Maryland's power comes from → Maryland power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BGS2 Solar Photovoltaic 40 MW 2022 –

Nearby

Other plants in Queen Anne's County

Jones Farm Solar · 64 MWBluegrass Solar · 40 MWWye Mills VNEM CSG · 10 MWChurch Hill · 6.0 MWQueen Anne's County · 2.0 MWChester Woods Point Solar, LLC CSG · 2.0 MWBd of Educ of Queen Anne's Cnty, Cnty HS · 1.7 MWChesapeake College · 1.5 MW

Questions

Bluegrass Solar 2, answered

How much power does Bluegrass Solar 2 produce?

Bluegrass Solar 2 has 40 MW of capacity from one generator. In 2025 it generated 76 GWh, 22% of the most it could have made running flat out all year (its capacity factor).

How many homes does Bluegrass Solar 2 power?

Its 2025 output of 76 GWh equals the yearly electricity use of about 6,700 average Maryland homes (944 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Bluegrass Solar 2?

Bluegrass Solar 2 is in Queen Anne's County, Maryland, at about 39.170°, -75.959°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Queen Anne's County goes 2.1 hours a year without power, the 21st most of 24 counties in Maryland. The county's page has the full outage record.

Who operates Bluegrass Solar 2?

It is operated by MN8 Energy LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Bluegrass Solar 2 open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Maryland home's 944 kWh a month in 2025. Methodology.