Natural gas power plant · Spokane, WA
Boulder Park
Boulder Park is a 25 MW natural gas power plant in Spokane County, Washington, operated by Avista Corp. Its oldest generator still running came online in 2002. In 2025 it generated 126 GWh, about what 11,000 average Washington homes use in a year.
Boulder Park in context
Among the 16 natural gas plants in Washington in the EIA's inventory, it is the 15th largest, about 0.6% of the state's 4.0 GW of natural gas capacity.
Spokane County has 7 power plants of 1 MW or more with 192 MW in all; Boulder Park is 13% of that and the 2nd largest of 2 natural gas plants there.
Its capacity factor of 58% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Spokane County goes 3.6 hours a year without power, the 21st most of 31 counties in Washington. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Boulder Park (outlined) and other plants in Spokane County, shaded. 47.697, -117.147.
Plant facts
- Operator
- Avista Corp
- Sector
- Electric Utility
- Grid operator
- AVA
- County
- Spokane County, WA
- EIA plant ID
- 8022
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Natural Gas Internal Combustion Engine | 4.1 MW | 2002 | – |
| 2 | Natural Gas Internal Combustion Engine | 4.1 MW | 2002 | – |
| 3 | Natural Gas Internal Combustion Engine | 4.1 MW | 2002 | – |
| 4 | Natural Gas Internal Combustion Engine | 4.1 MW | 2002 | – |
| 5 | Natural Gas Internal Combustion Engine | 4.1 MW | 2002 | – |
| 6 | Natural Gas Internal Combustion Engine | 4.1 MW | 2002 | – |
Nearby
Other plants in Spokane County
Questions
Boulder Park, answered
How much power does Boulder Park produce?
Boulder Park has 25 MW of capacity from 6 generators. In 2025 it generated 126 GWh, 58% of the most it could have made running flat out all year (its capacity factor).
How many homes does Boulder Park power?
Its 2025 output of 126 GWh equals the yearly electricity use of about 11,000 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Boulder Park?
Boulder Park is in Spokane County, Washington, at about 47.697°, -117.147°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Spokane County goes 3.6 hours a year without power, the 21st most of 31 counties in Washington. The county's page has the full outage record.
Who operates Boulder Park?
It is operated by Avista Corp (EIA sector: Electric Utility), and it feeds balancing authority AVA.
When did Boulder Park open?
Its oldest generator still running came online in 2002.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.