Solar power plant · Pike, MO

Bowling Green Renewable Energy Center

Bowling Green Renewable Energy Center is a 50 MW solar power plant in Pike County, Missouri, operated by Union Electric Co - (MO). Its oldest generator still running came online in 2025.

Capacity50 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Bowling Green Renewable Energy Center in context

Among the 38 solar plants in Missouri in the EIA's inventory, it is the 11th largest, about 2.6% of the state's 1.9 GW of solar capacity.

Pike County has 2 power plants of 1 MW or more with 290 MW in all; Bowling Green Renewable Energy Center is 17% of that.

The average electricity customer in Pike County goes 3.5 hours a year without power, the 79th most of 110 counties in Missouri. The county's page has the full outage record.

Where it is

Bowling Green Renewable Energy Center (outlined) and other plants in Pike County, shaded. 39.360, -91.230.

Plant facts

Operator
Union Electric Co - (MO)
Sector
Electric Utility
Grid operator
MISO
County
Pike County, MO
EIA plant ID
70041
Where Missouri's power comes from → Missouri power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BGREC Solar Photovoltaic 50 MW 2025 –

Nearby

Other plants in Pike County

Questions

Bowling Green Renewable Energy Center, answered

How much power does Bowling Green Renewable Energy Center produce?

Bowling Green Renewable Energy Center has 50 MW of capacity from one generator. No full year of generation is reported yet.

Where is Bowling Green Renewable Energy Center?

Bowling Green Renewable Energy Center is in Pike County, Missouri, at about 39.360°, -91.230°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Pike County goes 3.5 hours a year without power, the 79th most of 110 counties in Missouri. The county's page has the full outage record.

Who operates Bowling Green Renewable Energy Center?

It is operated by Union Electric Co - (MO) (EIA sector: Electric Utility), and it feeds MISO.

When did Bowling Green Renewable Energy Center open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.