Solar power plant · Pike, MO
Bowling Green Renewable Energy Center
Bowling Green Renewable Energy Center is a 50 MW solar power plant in Pike County, Missouri, operated by Union Electric Co - (MO). Its oldest generator still running came online in 2025.
Bowling Green Renewable Energy Center in context
Among the 38 solar plants in Missouri in the EIA's inventory, it is the 11th largest, about 2.6% of the state's 1.9 GW of solar capacity.
Pike County has 2 power plants of 1 MW or more with 290 MW in all; Bowling Green Renewable Energy Center is 17% of that.
The average electricity customer in Pike County goes 3.5 hours a year without power, the 79th most of 110 counties in Missouri. The county's page has the full outage record.
Where it is
Bowling Green Renewable Energy Center (outlined) and other plants in Pike County, shaded. 39.360, -91.230.
Plant facts
- Operator
- Union Electric Co - (MO)
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Pike County, MO
- EIA plant ID
- 70041
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BGREC | Solar Photovoltaic | 50 MW | 2025 | – |
Nearby
Other plants in Pike County
Questions
Bowling Green Renewable Energy Center, answered
How much power does Bowling Green Renewable Energy Center produce?
Bowling Green Renewable Energy Center has 50 MW of capacity from one generator. No full year of generation is reported yet.
Where is Bowling Green Renewable Energy Center?
Bowling Green Renewable Energy Center is in Pike County, Missouri, at about 39.360°, -91.230°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Pike County goes 3.5 hours a year without power, the 79th most of 110 counties in Missouri. The county's page has the full outage record.
Who operates Bowling Green Renewable Energy Center?
It is operated by Union Electric Co - (MO) (EIA sector: Electric Utility), and it feeds MISO.
When did Bowling Green Renewable Energy Center open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.