Solar power plant · Bee, TX
Brightside
Brightside is a 51 MW solar power plant in Bee County, Texas, operated by Luminant Generation Company LLC. Its oldest generator still running came online in 2022. In 2025 it generated 94 GWh, about what 7,100 average Texas homes use in a year.
Brightside in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 159th largest, about 0.1% of the state's 37 GW of solar capacity.
Bee County has 5 power plants of 1 MW or more with 818 MW in all; Brightside is 6% of that and the 2nd largest of 2 solar plants there.
Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Bee County goes 9.7 hours a year without power, the 122nd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Brightside (outlined) and other plants in Bee County, shaded. 28.431, -97.890.
Plant facts
- Operator
- Luminant Generation Company LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Bee County, TX
- EIA plant ID
- 63223
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| UNIT1 | Solar Photovoltaic | 51 MW | 2022 | – |
Nearby
Other plants in Bee County
Questions
Brightside, answered
How much power does Brightside produce?
Brightside has 51 MW of capacity from one generator. In 2025 it generated 94 GWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does Brightside power?
Its 2025 output of 94 GWh equals the yearly electricity use of about 7,100 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Brightside?
Brightside is in Bee County, Texas, at about 28.431°, -97.890°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Bee County goes 9.7 hours a year without power, the 122nd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Brightside?
It is operated by Luminant Generation Company LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Brightside open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.