Natural gas power plant · Mercer, NJ
Bristol Myers Squibb Lawrenceville
Bristol Myers Squibb Lawrenceville is a 11 MW natural gas power plant in Mercer County, New Jersey, operated by Bristol-Myers Squibb Co. Its oldest generator still running came online in 1991. In 2025 it generated 44 GWh, about what 5,400 average New Jersey homes use in a year.
Bristol Myers Squibb Lawrenceville in context
Among the 50 natural gas plants in New Jersey in the EIA's inventory, it is the 30th largest, about 0.1% of the state's 12 GW of natural gas capacity.
Mercer County has 26 power plants of 1 MW or more with 121 MW in all; Bristol Myers Squibb Lawrenceville is 9% of that and the largest of 4 natural gas plants there.
Its capacity factor of 45% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Mercer County goes 3.6 hours a year without power, the 14th most of 21 counties in New Jersey. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Bristol Myers Squibb Lawrenceville (outlined) and other plants in Mercer County, shaded. 40.325, -74.708.
Plant facts
- Operator
- Bristol-Myers Squibb Co
- Sector
- IPP CHP
- Grid operator
- PJM
- County
- Mercer County, NJ
- EIA plant ID
- 58947
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TG102 | Natural Gas Fired Combustion Turbine | 5.6 MW | 2021 | – |
| TG101 | Natural Gas Fired Combustion Turbine | 4.3 MW | 1995 | – |
| DG101 | Petroleum Liquids | 1.2 MW | 1991 | – |
Nearby
Other plants in Mercer County
Questions
Bristol Myers Squibb Lawrenceville, answered
How much power does Bristol Myers Squibb Lawrenceville produce?
Bristol Myers Squibb Lawrenceville has 11 MW of capacity from 3 generators. In 2025 it generated 44 GWh, 45% of the most it could have made running flat out all year (its capacity factor).
How many homes does Bristol Myers Squibb Lawrenceville power?
Its 2025 output of 44 GWh equals the yearly electricity use of about 5,400 average New Jersey homes (670 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Bristol Myers Squibb Lawrenceville?
Bristol Myers Squibb Lawrenceville is in Mercer County, New Jersey, at about 40.325°, -74.708°. It is one of 26 power plants of 1 MW or more in the county. The average electricity customer in Mercer County goes 3.6 hours a year without power, the 14th most of 21 counties in New Jersey. The county's page has the full outage record.
Who operates Bristol Myers Squibb Lawrenceville?
It is operated by Bristol-Myers Squibb Co (EIA sector: IPP CHP), and it feeds PJM Interconnection.
When did Bristol Myers Squibb Lawrenceville open?
Its oldest generator still running came online in 1991.