Solar power plant · Union, OH

Cadence Solar Energy Center

Cadence Solar Energy Center is a 240 MW solar power plant in Union County, Ohio, operated by Cadence Solar Energy LLC. Its oldest generator still running came online in 2026.

Capacity240 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Cadence Solar Energy Center in context

Among the 77 solar plants in Ohio in the EIA's inventory, it is the 6th largest, about 4.8% of the state's 5.0 GW of solar capacity.

Union County has 2 power plants of 1 MW or more with 565 MW in all; Cadence Solar Energy Center is 42% of that and the 2nd largest of 2 solar plants there.

The average electricity customer in Union County goes 1.8 hours a year without power, the 84th most of 88 counties in Ohio. The county's page has the full outage record.

Where it is

Cadence Solar Energy Center (outlined) and other plants in Union County, shaded. 40.378, -83.437.

Plant facts

Operator
Cadence Solar Energy LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
Union County, OH
EIA plant ID
68431
Where Ohio's power comes from → Ohio power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CADNC Solar Photovoltaic 240 MW 2026 –

Nearby

Other plants in Union County

Questions

Cadence Solar Energy Center, answered

How much power does Cadence Solar Energy Center produce?

Cadence Solar Energy Center has 240 MW of capacity from one generator. No full year of generation is reported yet.

Where is Cadence Solar Energy Center?

Cadence Solar Energy Center is in Union County, Ohio, at about 40.378°, -83.437°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Union County goes 1.8 hours a year without power, the 84th most of 88 counties in Ohio. The county's page has the full outage record.

Who operates Cadence Solar Energy Center?

It is operated by Cadence Solar Energy LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Cadence Solar Energy Center open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.