Hydro power plant · Blount, TN
Calderwood
Calderwood is a 157 MW hydro power plant in Blount County, Tennessee, operated by Brookfield Smoky Mountain Hydropower LP. Its oldest generator still running came online in 1930. In 2025 it generated 569 GWh, about what 40,000 average Tennessee homes use in a year.
Calderwood in context
Among the 28 hydro plants in Tennessee in the EIA's inventory, it is the 4th largest, about 6.2% of the state's 2.5 GW of hydro capacity.
Blount County has 5 power plants of 1 MW or more with 217 MW in all; Calderwood is 72% of that and the largest of 2 hydro plants there.
Its capacity factor of 42% in 2025 is higher than the 34% typical for hydro plants across the US.
The average electricity customer in Blount County goes 4.5 hours a year without power, the 39th most of 73 counties in Tennessee. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Calderwood (outlined) and other plants in Blount County, shaded. 35.492, -83.981.
Plant facts
- Operator
- Brookfield Smoky Mountain Hydropower LP
- Sector
- IPP Non-CHP
- Grid operator
- TVA
- County
- Blount County, TN
- EIA plant ID
- 54900
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 52 MW | 1930 | – |
| 2 | Conventional Hydroelectric | 52 MW | 1930 | – |
| 3 | Conventional Hydroelectric | 52 MW | 1938 | – |
Nearby
Other plants in Blount County
Questions
Calderwood, answered
How much power does Calderwood produce?
Calderwood has 157 MW of capacity from 3 generators. In 2025 it generated 569 GWh, 42% of the most it could have made running flat out all year (its capacity factor).
How many homes does Calderwood power?
Its 2025 output of 569 GWh equals the yearly electricity use of about 40,000 average Tennessee homes (1,180 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Calderwood?
Calderwood is in Blount County, Tennessee, at about 35.492°, -83.981°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Blount County goes 4.5 hours a year without power, the 39th most of 73 counties in Tennessee. The county's page has the full outage record.
Who operates Calderwood?
It is operated by Brookfield Smoky Mountain Hydropower LP (EIA sector: IPP Non-CHP), and it feeds the Tennessee Valley Authority.
When did Calderwood open?
Its oldest generator still running came online in 1930.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Tennessee home's 1,180 kWh a month in 2025. Methodology.