Natural gas power plant · Isanti, MN
Cambridge CT Hybrid
Cambridge CT Hybrid is a 194 MW natural gas power plant in Isanti County, Minnesota, operated by Great River Energy. Its oldest generator still running came online in 1978. In 2025 it generated 101 GWh, about what 11,000 average Minnesota homes use in a year.
Cambridge CT Hybrid in context
Among the 34 natural gas plants in Minnesota in the EIA's inventory, it is the 12th largest, about 3.0% of the state's 6.4 GW of natural gas capacity.
Isanti County has 6 power plants of 1 MW or more with 215 MW in all; Cambridge CT Hybrid is 90% of that.
Its capacity factor of 6% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in Isanti County goes 3.0 hours a year without power, the 26th most of 54 counties in Minnesota. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cambridge CT Hybrid (outlined) and other plants in Isanti County, shaded. 45.601, -93.208.
Plant facts
- Operator
- Great River Energy
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Isanti County, MN
- EIA plant ID
- 2038
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GT2 | Natural Gas Fired Combustion Turbine | 169 MW | 2007 | – |
| GT1 | Petroleum Liquids | 25 MW | 1978 | – |
Planned
| Generator | Technology | Capacity | Expected |
|---|---|---|---|
| BA1 | Batteries | 1.0 MW | 2027 |
Nearby
Other plants in Isanti County
Questions
Cambridge CT Hybrid, answered
How much power does Cambridge CT Hybrid produce?
Cambridge CT Hybrid has 194 MW of capacity from 2 generators. In 2025 it generated 101 GWh, 6% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cambridge CT Hybrid power?
Its 2025 output of 101 GWh equals the yearly electricity use of about 11,000 average Minnesota homes (743 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cambridge CT Hybrid?
Cambridge CT Hybrid is in Isanti County, Minnesota, at about 45.601°, -93.208°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Isanti County goes 3.0 hours a year without power, the 26th most of 54 counties in Minnesota. The county's page has the full outage record.
Who operates Cambridge CT Hybrid?
It is operated by Great River Energy (EIA sector: Electric Utility), and it feeds MISO.
When did Cambridge CT Hybrid open?
Its oldest generator still running came online in 1978. 1 more generator is planned.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Minnesota home's 743 kWh a month in 2025. Methodology.