Solar power plant · Morrison, MN

Camp Ripley Solar

Camp Ripley Solar is a 11 MW solar power plant in Morrison County, Minnesota, operated by Camp Riley Solar Facility. Its oldest generator still running came online in 2016. In 2025 it generated 14 GWh, about what 1,600 average Minnesota homes use in a year.

Capacity11 MWNameplate, September 2026
Generated14 GWhIn 2025
Capacity factor15%Share of the most it could make, 2025
Generators1Oldest from 2016

Camp Ripley Solar in context

Among the 544 solar plants in Minnesota in the EIA's inventory, it is the 11th largest, about 0.5% of the state's 2.1 GW of solar capacity.

Morrison County has 3 power plants of 1 MW or more with 34 MW in all; Camp Ripley Solar is 33% of that.

Its capacity factor of 15% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Morrison County goes 3.8 hours a year without power, the 18th most of 54 counties in Minnesota. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05101520202020212022202320242025GWh 14
0510152020202021202220232024202514

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Camp Ripley Solar (outlined) and other plants in Morrison County, shaded. 46.091, -94.340.

Plant facts

Operator
Camp Riley Solar Facility
Sector
Electric Utility
Grid operator
MISO
County
Morrison County, MN
EIA plant ID
64072
Where Minnesota's power comes from → Minnesota power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CR1 Solar Photovoltaic 11 MW 2016 –

Nearby

Other plants in Morrison County

Blanchard · 18 MWLittle Falls (MN) · 4.6 MW

Questions

Camp Ripley Solar, answered

How much power does Camp Ripley Solar produce?

Camp Ripley Solar has 11 MW of capacity from one generator. In 2025 it generated 14 GWh, 15% of the most it could have made running flat out all year (its capacity factor).

How many homes does Camp Ripley Solar power?

Its 2025 output of 14 GWh equals the yearly electricity use of about 1,600 average Minnesota homes (743 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Camp Ripley Solar?

Camp Ripley Solar is in Morrison County, Minnesota, at about 46.091°, -94.340°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Morrison County goes 3.8 hours a year without power, the 18th most of 54 counties in Minnesota. The county's page has the full outage record.

Who operates Camp Ripley Solar?

It is operated by Camp Riley Solar Facility (EIA sector: Electric Utility), and it feeds MISO.

When did Camp Ripley Solar open?

Its oldest generator still running came online in 2016.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Minnesota home's 743 kWh a month in 2025. Methodology.