Wind power plant · McDonough, IL
Cardinal Point Wind
Cardinal Point Wind is a 150 MW wind power plant in McDonough County, Illinois, operated by Cardinal Point LLC. Its oldest generator still running came online in 2020. In 2025 it generated 510 GWh, about what 59,000 average Illinois homes use in a year.
Cardinal Point Wind in context
Among the 56 wind plants in Illinois in the EIA's inventory, it is the 33rd largest, about 1.7% of the state's 8.7 GW of wind capacity.
McDonough County has 7 power plants of 1 MW or more with 174 MW in all; Cardinal Point Wind is 86% of that.
Its capacity factor of 39% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in McDonough County goes 2.7 hours a year without power, the 76th most of 101 counties in Illinois. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cardinal Point Wind (outlined) and other plants in McDonough County, shaded. 40.589, -90.752.
Plant facts
- Operator
- Cardinal Point LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- McDonough County, IL
- EIA plant ID
- 59902
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN | Onshore Wind Turbine | 150 MW | 2020 | – |
Nearby
Other plants in McDonough County
Questions
Cardinal Point Wind, answered
How much power does Cardinal Point Wind produce?
Cardinal Point Wind has 150 MW of capacity from one generator. In 2025 it generated 510 GWh, 39% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cardinal Point Wind power?
Its 2025 output of 510 GWh equals the yearly electricity use of about 59,000 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cardinal Point Wind?
Cardinal Point Wind is in McDonough County, Illinois, at about 40.589°, -90.752°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in McDonough County goes 2.7 hours a year without power, the 76th most of 101 counties in Illinois. The county's page has the full outage record.
Who operates Cardinal Point Wind?
It is operated by Cardinal Point LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Cardinal Point Wind open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.