Wind power plant · Natrona, WY
Casper Wind Farm
Casper Wind Farm is a 17 MW wind power plant in Natrona County, Wyoming, operated by Chevron USA. Its oldest generator still running came online in 2009.
Casper Wind Farm in context
Among the 28 wind plants in Wyoming in the EIA's inventory, it is the 28th largest, about 0.4% of the state's 4.7 GW of wind capacity.
Natrona County has 4 power plants of 1 MW or more with 250 MW in all; Casper Wind Farm is 7% of that and the 2nd largest of 2 wind plants there.
The average electricity customer in Natrona County goes 1.6 hours a year without power, the 13th most of 20 counties in Wyoming. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Where it is
Casper Wind Farm (outlined) and other plants in Natrona County, shaded. 42.885, -106.221.
Plant facts
- Operator
- Chevron USA
- Sector
- IPP Non-CHP
- Grid operator
- PACE
- County
- Natrona County, WY
- EIA plant ID
- 57093
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CWGT | Onshore Wind Turbine | 17 MW | 2009 | – |
Nearby
Other plants in Natrona County
Questions
Casper Wind Farm, answered
How much power does Casper Wind Farm produce?
Casper Wind Farm has 17 MW of capacity from one generator. No full year of generation is reported yet.
Where is Casper Wind Farm?
Casper Wind Farm is in Natrona County, Wyoming, at about 42.885°, -106.221°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Natrona County goes 1.6 hours a year without power, the 13th most of 20 counties in Wyoming. The county's page has the full outage record.
Who operates Casper Wind Farm?
It is operated by Chevron USA (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.
When did Casper Wind Farm open?
Its oldest generator still running came online in 2009.