Wind power plant · Twin Falls, ID
Cassia Gulch
Cassia Gulch is a 19 MW wind power plant in Twin Falls County, Idaho, operated by Cassia Gulch Wind Park, LLC. Its oldest generator still running came online in 2009. In 2025 it generated 35 GWh, about what 3,200 average Idaho homes use in a year.
Cassia Gulch in context
Among the 33 wind plants in Idaho in the EIA's inventory, it is the 25th largest, about 1.7% of the state's 1.1 GW of wind capacity.
Twin Falls County has 27 power plants of 1 MW or more with 598 MW in all; Cassia Gulch is 3% of that and the 5th largest of 11 wind plants there.
Its capacity factor of 21% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Twin Falls County goes 2.0 hours a year without power, the 31st most of 35 counties in Idaho. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cassia Gulch (outlined) and other plants in Twin Falls County, shaded. 42.874, -115.017.
Plant facts
- Operator
- Cassia Gulch Wind Park, LLC
- Sector
- IPP Non-CHP
- Grid operator
- IPCO
- County
- Twin Falls County, ID
- EIA plant ID
- 56935
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 19 MW | 2009 | – |
Questions
Cassia Gulch, answered
How much power does Cassia Gulch produce?
Cassia Gulch has 19 MW of capacity from one generator. In 2025 it generated 35 GWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cassia Gulch power?
Its 2025 output of 35 GWh equals the yearly electricity use of about 3,200 average Idaho homes (933 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cassia Gulch?
Cassia Gulch is in Twin Falls County, Idaho, at about 42.874°, -115.017°. It is one of 27 power plants of 1 MW or more in the county. The average electricity customer in Twin Falls County goes 2.0 hours a year without power, the 31st most of 35 counties in Idaho. The county's page has the full outage record.
Who operates Cassia Gulch?
It is operated by Cassia Gulch Wind Park, LLC (EIA sector: IPP Non-CHP), and it feeds Idaho Power.
When did Cassia Gulch open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Idaho home's 933 kWh a month in 2025. Methodology.