Wind power plant · Weld, CO
Cedar Creek Wind
Cedar Creek Wind is a 301 MW wind power plant in Weld County, Colorado, operated by Leeward Asset Management, LLC. Its oldest generator still running came online in 2007. In 2025 it generated 689 GWh, about what 87,000 average Colorado homes use in a year.
Cedar Creek Wind in context
Among the 34 wind plants in Colorado in the EIA's inventory, it is the 4th largest, about 5.1% of the state's 5.9 GW of wind capacity.
Weld County has 57 power plants of 1 MW or more with 4.3 GW in all; Cedar Creek Wind is 7% of that and the largest of 4 wind plants there.
Its capacity factor of 26% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Weld County goes 3.8 hours a year without power, the 14th most of 39 counties in Colorado. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cedar Creek Wind (outlined) and other plants in Weld County, shaded. 40.894, -104.021.
Plant facts
- Operator
- Leeward Asset Management, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PSCO
- County
- Weld County, CO
- EIA plant ID
- 56371
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 221 MW | 2007 | – |
| 2 | Onshore Wind Turbine | 80 MW | 2007 | – |
Questions
Cedar Creek Wind, answered
How much power does Cedar Creek Wind produce?
Cedar Creek Wind has 301 MW of capacity from 2 generators. In 2025 it generated 689 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cedar Creek Wind power?
Its 2025 output of 689 GWh equals the yearly electricity use of about 87,000 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cedar Creek Wind?
Cedar Creek Wind is in Weld County, Colorado, at about 40.894°, -104.021°. It is one of 57 power plants of 1 MW or more in the county. The average electricity customer in Weld County goes 3.8 hours a year without power, the 14th most of 39 counties in Colorado. The county's page has the full outage record.
Who operates Cedar Creek Wind?
It is operated by Leeward Asset Management, LLC (EIA sector: IPP Non-CHP), and it feeds Public Service Company of Colorado.
When did Cedar Creek Wind open?
Its oldest generator still running came online in 2007.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.