Wind power plant · Bingham, ID
Cedar Creek Wind, LLC
Cedar Creek Wind, LLC is a 160 MW wind power plant in Bingham County, Idaho, operated by Cedar Creek Wind, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 455 GWh, about what 41,000 average Idaho homes use in a year.
Cedar Creek Wind, LLC in context
Among the 33 wind plants in Idaho in the EIA's inventory, it is the largest, about 14% of the state's 1.1 GW of wind capacity.
Its capacity factor of 33% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Bingham County goes 5.1 hours a year without power, the 16th most of 35 counties in Idaho. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cedar Creek Wind, LLC (outlined) and other plants in Bingham County, shaded. 43.328, -112.058.
Plant facts
- Operator
- Cedar Creek Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PACE
- County
- Bingham County, ID
- EIA plant ID
- 65311
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CDCRK | Onshore Wind Turbine | 160 MW | 2024 | – |
Questions
Cedar Creek Wind, LLC, answered
How much power does Cedar Creek Wind, LLC produce?
Cedar Creek Wind, LLC has 160 MW of capacity from one generator. In 2025 it generated 455 GWh, 33% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cedar Creek Wind, LLC power?
Its 2025 output of 455 GWh equals the yearly electricity use of about 41,000 average Idaho homes (933 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cedar Creek Wind, LLC?
Cedar Creek Wind, LLC is in Bingham County, Idaho, at about 43.328°, -112.058°. The average electricity customer in Bingham County goes 5.1 hours a year without power, the 16th most of 35 counties in Idaho. The county's page has the full outage record.
Who operates Cedar Creek Wind, LLC?
It is operated by Cedar Creek Wind, LLC (EIA sector: IPP Non-CHP), and it feeds PacifiCorp East.
When did Cedar Creek Wind, LLC open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Idaho home's 933 kWh a month in 2025. Methodology.