Cedar Ridge is a 68 MW wind power plant in Fond du Lac County, Wisconsin, operated by Wisconsin Power & Light Co. Its oldest generator still running came online in 2008. In 2025 it generated 185 GWh, about what 23,000 average Wisconsin homes use in a year.
Cedar Ridge in context
Among the 12 wind plants in Wisconsin in the EIA's inventory, it is the 6th largest, about 8.2% of the state's 823 MW of wind capacity.
Fond du Lac County has 8 power plants of 1 MW or more with 608 MW in all; Cedar Ridge is 11% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 31% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Fond du Lac County goes 1.3 hours a year without power, the 62nd most of 72 counties in Wisconsin. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cedar Ridge (outlined) and other plants in Fond du Lac County, shaded. 43.693, -88.330.
Plant facts
- Operator
- Wisconsin Power & Light Co
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Fond du Lac County, WI
- EIA plant ID
- 56347
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 68 MW | 2008 | – |
Nearby
Other plants in Fond du Lac County
Questions
Cedar Ridge, answered
How much power does Cedar Ridge produce?
Cedar Ridge has 68 MW of capacity from one generator. In 2025 it generated 185 GWh, 31% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cedar Ridge power?
Its 2025 output of 185 GWh equals the yearly electricity use of about 23,000 average Wisconsin homes (667 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cedar Ridge?
Cedar Ridge is in Fond du Lac County, Wisconsin, at about 43.693°, -88.330°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Fond du Lac County goes 1.3 hours a year without power, the 62nd most of 72 counties in Wisconsin. The county's page has the full outage record.
Who operates Cedar Ridge?
It is operated by Wisconsin Power & Light Co (EIA sector: Electric Utility), and it feeds MISO.
When did Cedar Ridge open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Wisconsin home's 667 kWh a month in 2025. Methodology.