Natural gas power plant · Adams, CO
Cherokee
Cherokee is a 1.0 GW natural gas power plant in Adams County, Colorado, operated by Public Service Co of Colorado. Its oldest generator still running came online in 1968. In 2025 it generated 3.7 TWh, about what 465,000 average Colorado homes use in a year.
Cherokee in context
Among the 31 natural gas plants in Colorado in the EIA's inventory, it is the 2nd largest, about 11% of the state's 9.0 GW of natural gas capacity.
Adams County has 36 power plants of 1 MW or more with 1.8 GW in all; Cherokee is 57% of that and the largest of 4 natural gas plants there.
Its capacity factor of 42% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Adams County goes 2.4 hours a year without power, the 27th most of 39 counties in Colorado. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cherokee (outlined) and other plants in Adams County, shaded. 39.807, -104.965.
Plant facts
- Operator
- Public Service Co of Colorado
- Sector
- Electric Utility
- Grid operator
- PSCO
- County
- Adams County, CO
- EIA plant ID
- 469
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 4 | Natural Gas Steam Turbine | 381 MW | 1968 | 2028 |
| 7 | Natural Gas Fired Combined Cycle | 255 MW | 2015 | – |
| 5 | Natural Gas Fired Combined Cycle | 185 MW | 2015 | – |
| 6 | Natural Gas Fired Combined Cycle | 185 MW | 2015 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| 2 | Conventional Steam Coal | 125 MW | 1959 | 2011 |
| 1 | Conventional Steam Coal | 125 MW | 1957 | 2012 |
| 3 | Conventional Steam Coal | 171 MW | 1962 | 2015 |
Nearby
Other plants in Adams County
Questions
Cherokee, answered
How much power does Cherokee produce?
Cherokee has 1.0 GW of capacity from 4 generators. In 2025 it generated 3.7 TWh, 42% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cherokee power?
Its 2025 output of 3.7 TWh equals the yearly electricity use of about 465,000 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cherokee?
Cherokee is in Adams County, Colorado, at about 39.807°, -104.965°. It is one of 36 power plants of 1 MW or more in the county. The average electricity customer in Adams County goes 2.4 hours a year without power, the 27th most of 39 counties in Colorado. The county's page has the full outage record.
Who operates Cherokee?
It is operated by Public Service Co of Colorado (EIA sector: Electric Utility), and it feeds Public Service Company of Colorado.
When did Cherokee open?
Its oldest generator still running came online in 1968. Planned retirements are scheduled for 2028.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.