Solar power plant · Cross, AR

Cherry Valley PV I

Cherry Valley PV I is a 135 MW solar power plant in Cross County, Arkansas, operated by Cherry Valley PV I, LLC. Its oldest generator still running came online in 2026.

Capacity135 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Cherry Valley PV I in context

Among the 70 solar plants in Arkansas in the EIA's inventory, it is the 10th largest, about 4.8% of the state's 2.8 GW of solar capacity.

Cross County has 4 power plants of 1 MW or more with 419 MW in all; Cherry Valley PV I is 32% of that and the 2nd largest of 3 solar plants there.

The average electricity customer in Cross County goes 16 hours a year without power, the 20th most of 73 counties in Arkansas. The county's page has the full outage record.

Where it is

Cherry Valley PV I (outlined) and other plants in Cross County, shaded. 35.389, -90.755.

Plant facts

Operator
Cherry Valley PV I, LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Cross County, AR
EIA plant ID
67992
Where Arkansas's power comes from → Arkansas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CHVLY Solar Photovoltaic 135 MW 2026 –

Nearby

Other plants in Cross County

Questions

Cherry Valley PV I, answered

How much power does Cherry Valley PV I produce?

Cherry Valley PV I has 135 MW of capacity from one generator. No full year of generation is reported yet.

Where is Cherry Valley PV I?

Cherry Valley PV I is in Cross County, Arkansas, at about 35.389°, -90.755°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Cross County goes 16 hours a year without power, the 20th most of 73 counties in Arkansas. The county's page has the full outage record.

Who operates Cherry Valley PV I?

It is operated by Cherry Valley PV I, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Cherry Valley PV I open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.