Natural gas power plant · Chesterfield, VA

Chesterfield

Chesterfield is a 447 MW natural gas power plant in Chesterfield County, Virginia, operated by Virginia Electric & Power Co. Its oldest generator still running came online in 1990. In 2025 it generated 2.1 TWh, about what 162,000 average Virginia homes use in a year.

Capacity447 MWNameplate, September 2026
Generated2.1 TWhIn 2025
Capacity factor53%Share of the most it could make, 2025
Generators4Oldest from 1990

Chesterfield in context

Among the 30 natural gas plants in Virginia in the EIA's inventory, it is the 14th largest, about 2.9% of the state's 15 GW of natural gas capacity.

Chesterfield County has 7 power plants of 1 MW or more with 504 MW in all; Chesterfield is 89% of that and the largest of 2 natural gas plants there.

Its capacity factor of 53% in 2025 is higher than the 23% typical for natural gas plants across the US.

The average electricity customer in Chesterfield County goes 7.4 hours a year without power, the 88th most of 123 counties in Virginia. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01,0002,0003,0004,0005,00020182019202020212022202320242025GWh 2,070
01,0002,0003,0004,0005,00020192021202320252,070

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Chesterfield (outlined) and other plants in Chesterfield County, shaded. 37.382, -77.383.

Plant facts

Operator
Virginia Electric & Power Co
Sector
Electric Utility
Grid operator
PJM
County
Chesterfield County, VA
EIA plant ID
3797
Where Virginia's power comes from → Virginia power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CT8 Natural Gas Fired Combined Cycle 148 MW 1992 –
CT7 Natural Gas Fired Combined Cycle 145 MW 1990 –
CW8 Natural Gas Fired Combined Cycle 79 MW 1992 –
CW7 Natural Gas Fired Combined Cycle 74 MW 1990 –

Planned

GeneratorTechnologyCapacityExpected
CERC1Natural Gas Fired Combustion Turbine250 MW2029
CERC2Natural Gas Fired Combustion Turbine250 MW2029
CERC3Natural Gas Fired Combustion Turbine250 MW2029
CERC4Natural Gas Fired Combustion Turbine250 MW2029

Retired

GeneratorTechnologyCapacityOnlineRetired
3Conventional Steam Coal113 MW19522019
4Conventional Steam Coal188 MW19602019
5Conventional Steam Coal359 MW19642023
6Conventional Steam Coal694 MW19692023

Nearby

Other plants in Chesterfield County

Dry Bridge Storage · 20 MWChesterfield Landfill Gas · 14 MWPark 500 Philip Morris USA · 13 MWMoseley Hermon Solar · 5.0 MWBrasfield · 2.9 MWPhilip Morris · 2.0 MW

Questions

Chesterfield, answered

How much power does Chesterfield produce?

Chesterfield has 447 MW of capacity from 4 generators. In 2025 it generated 2.1 TWh, 53% of the most it could have made running flat out all year (its capacity factor).

How many homes does Chesterfield power?

Its 2025 output of 2.1 TWh equals the yearly electricity use of about 162,000 average Virginia homes (1,067 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Chesterfield?

Chesterfield is in Chesterfield County, Virginia, at about 37.382°, -77.383°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Chesterfield County goes 7.4 hours a year without power, the 88th most of 123 counties in Virginia. The county's page has the full outage record.

Who operates Chesterfield?

It is operated by Virginia Electric & Power Co (EIA sector: Electric Utility), and it feeds PJM Interconnection.

When did Chesterfield open?

Its oldest generator still running came online in 1990. 4 more generators are planned.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Virginia home's 1,067 kWh a month in 2025. Methodology.