Wind power plant · Coconino, AZ
Chevelon Butte Phase 2
Chevelon Butte Phase 2 is a 216 MW wind power plant in Coconino County, Arizona, operated by AES Clean Energy. Its oldest generator still running came online in 2024. In 2025 it generated 526 GWh, about what 43,000 average Arizona homes use in a year.
Chevelon Butte Phase 2 in context
Among the 9 wind plants in Arizona in the EIA's inventory, it is the 4th largest, about 13% of the state's 1.7 GW of wind capacity.
Coconino County has 5 power plants of 1 MW or more with 2.0 GW in all; Chevelon Butte Phase 2 is 11% of that and the 2nd largest of 4 wind plants there.
Its capacity factor of 28% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Coconino County goes 1.8 hours a year without power, the 6th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Chevelon Butte Phase 2 (outlined) and other plants in Coconino County, shaded. 34.682, -110.803.
Plant facts
- Operator
- AES Clean Energy
- Sector
- IPP Non-CHP
- Grid operator
- AZPS
- County
- Coconino County, AZ
- EIA plant ID
- 67176
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CHVB2 | Onshore Wind Turbine | 216 MW | 2024 | – |
Nearby
Other plants in Coconino County
Questions
Chevelon Butte Phase 2, answered
How much power does Chevelon Butte Phase 2 produce?
Chevelon Butte Phase 2 has 216 MW of capacity from one generator. In 2025 it generated 526 GWh, 28% of the most it could have made running flat out all year (its capacity factor).
How many homes does Chevelon Butte Phase 2 power?
Its 2025 output of 526 GWh equals the yearly electricity use of about 43,000 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Chevelon Butte Phase 2?
Chevelon Butte Phase 2 is in Coconino County, Arizona, at about 34.682°, -110.803°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Coconino County goes 1.8 hours a year without power, the 6th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Chevelon Butte Phase 2?
It is operated by AES Clean Energy (EIA sector: IPP Non-CHP), and it feeds Arizona Public Service.
When did Chevelon Butte Phase 2 open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.