Wind power plant · Chickasaw, IA

Chickasaw Wind Farm

Chickasaw Wind Farm is a 202 MW wind power plant in Chickasaw County, Iowa, operated by MidAmerican Energy Co. Its oldest generator still running came online in 2023. In 2025 it generated 645 GWh, about what 62,000 average Iowa homes use in a year.

Capacity202 MWNameplate, September 2026
Generated645 GWhIn 2025
Capacity factor36%Share of the most it could make, 2025
Generators1Oldest from 2023

Chickasaw Wind Farm in context

Among the 123 wind plants in Iowa in the EIA's inventory, it is the 22nd largest, about 1.5% of the state's 13 GW of wind capacity.

Chickasaw County has 2 power plants of 1 MW or more with 229 MW in all; Chickasaw Wind Farm is 88% of that.

Its capacity factor of 36% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Chickasaw County goes 2.2 hours a year without power, the 71st most of 98 counties in Iowa. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0200400600800202320242025GWh 645
0200400600800202320242025645

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Chickasaw Wind Farm (outlined) and other plants in Chickasaw County, shaded. 43.140, -92.324.

Plant facts

Operator
MidAmerican Energy Co
Sector
Electric Utility
Grid operator
MISO
County
Chickasaw County, IA
EIA plant ID
66668
Where Iowa's power comes from → Iowa power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
CKWF Onshore Wind Turbine 202 MW 2023 –

Nearby

Other plants in Chickasaw County

Questions

Chickasaw Wind Farm, answered

How much power does Chickasaw Wind Farm produce?

Chickasaw Wind Farm has 202 MW of capacity from one generator. In 2025 it generated 645 GWh, 36% of the most it could have made running flat out all year (its capacity factor).

How many homes does Chickasaw Wind Farm power?

Its 2025 output of 645 GWh equals the yearly electricity use of about 62,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Chickasaw Wind Farm?

Chickasaw Wind Farm is in Chickasaw County, Iowa, at about 43.140°, -92.324°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Chickasaw County goes 2.2 hours a year without power, the 71st most of 98 counties in Iowa. The county's page has the full outage record.

Who operates Chickasaw Wind Farm?

It is operated by MidAmerican Energy Co (EIA sector: Electric Utility), and it feeds MISO.

When did Chickasaw Wind Farm open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.