Hydro power plant · Douglas, WA

Chief Joseph

Chief Joseph is a 2.5 GW hydro power plant in Douglas County, Washington, operated by USACE Northwestern Division. Its oldest generator still running came online in 1955. In 2025 it generated 9.8 TWh, about what 865,000 average Washington homes use in a year.

Capacity2.5 GWNameplate, September 2026
Generated9.8 TWhIn 2025
Capacity factor46%Share of the most it could make, 2025
Generators27Oldest from 1955

Chief Joseph in context

Among the 73 hydro plants in Washington in the EIA's inventory, it is the 2nd largest, about 11% of the state's 22 GW of hydro capacity.

Its capacity factor of 46% in 2025 is higher than the 34% typical for hydro plants across the US.

The average electricity customer in Douglas County goes 2.8 hours a year without power, the 22nd most of 31 counties in Washington. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05,00010,00015,00020182019202020212022202320242025GWh 9,806
05,00010,00015,00020192021202320259,806

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Chief Joseph (outlined) and other plants in Douglas County, shaded. 47.995, -119.640.

Plant facts

Operator
USACE Northwestern Division
Sector
Electric Utility
Grid operator
BPAT
County
Douglas County, WA
EIA plant ID
3921
Where Washington's power comes from → Washington power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
17 Conventional Hydroelectric 95 MW 1977 –
18 Conventional Hydroelectric 95 MW 1977 –
19 Conventional Hydroelectric 95 MW 1977 –
20 Conventional Hydroelectric 95 MW 1978 –
21 Conventional Hydroelectric 95 MW 1978 –
22 Conventional Hydroelectric 95 MW 1978 –
23 Conventional Hydroelectric 95 MW 1978 –
24 Conventional Hydroelectric 95 MW 1979 –
25 Conventional Hydroelectric 95 MW 1979 –
26 Conventional Hydroelectric 95 MW 1979 –
27 Conventional Hydroelectric 95 MW 1979 –
10 Conventional Hydroelectric 88 MW 1955 –
11 Conventional Hydroelectric 88 MW 1955 –
12 Conventional Hydroelectric 88 MW 1955 –
9 Conventional Hydroelectric 88 MW 1955 –

Questions

Chief Joseph, answered

How much power does Chief Joseph produce?

Chief Joseph has 2.5 GW of capacity from 27 generators. In 2025 it generated 9.8 TWh, 46% of the most it could have made running flat out all year (its capacity factor).

How many homes does Chief Joseph power?

Its 2025 output of 9.8 TWh equals the yearly electricity use of about 865,000 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Chief Joseph?

Chief Joseph is in Douglas County, Washington, at about 47.995°, -119.640°. The average electricity customer in Douglas County goes 2.8 hours a year without power, the 22nd most of 31 counties in Washington. The county's page has the full outage record.

Who operates Chief Joseph?

It is operated by USACE Northwestern Division (EIA sector: Electric Utility), and it feeds the Bonneville Power Administration.

When did Chief Joseph open?

Its oldest generator still running came online in 1955.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.