Hydro power plant · Douglas, WA
Chief Joseph
Chief Joseph is a 2.5 GW hydro power plant in Douglas County, Washington, operated by USACE Northwestern Division. Its oldest generator still running came online in 1955. In 2025 it generated 9.8 TWh, about what 865,000 average Washington homes use in a year.
Chief Joseph in context
Among the 73 hydro plants in Washington in the EIA's inventory, it is the 2nd largest, about 11% of the state's 22 GW of hydro capacity.
Its capacity factor of 46% in 2025 is higher than the 34% typical for hydro plants across the US.
The average electricity customer in Douglas County goes 2.8 hours a year without power, the 22nd most of 31 counties in Washington. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Chief Joseph (outlined) and other plants in Douglas County, shaded. 47.995, -119.640.
Plant facts
- Operator
- USACE Northwestern Division
- Sector
- Electric Utility
- Grid operator
- BPAT
- County
- Douglas County, WA
- EIA plant ID
- 3921
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 17 | Conventional Hydroelectric | 95 MW | 1977 | – |
| 18 | Conventional Hydroelectric | 95 MW | 1977 | – |
| 19 | Conventional Hydroelectric | 95 MW | 1977 | – |
| 20 | Conventional Hydroelectric | 95 MW | 1978 | – |
| 21 | Conventional Hydroelectric | 95 MW | 1978 | – |
| 22 | Conventional Hydroelectric | 95 MW | 1978 | – |
| 23 | Conventional Hydroelectric | 95 MW | 1978 | – |
| 24 | Conventional Hydroelectric | 95 MW | 1979 | – |
| 25 | Conventional Hydroelectric | 95 MW | 1979 | – |
| 26 | Conventional Hydroelectric | 95 MW | 1979 | – |
| 27 | Conventional Hydroelectric | 95 MW | 1979 | – |
| 10 | Conventional Hydroelectric | 88 MW | 1955 | – |
| 11 | Conventional Hydroelectric | 88 MW | 1955 | – |
| 12 | Conventional Hydroelectric | 88 MW | 1955 | – |
| 9 | Conventional Hydroelectric | 88 MW | 1955 | – |
| 6 | Conventional Hydroelectric | 88 MW | 1956 | – |
| 7 | Conventional Hydroelectric | 88 MW | 1956 | – |
| 8 | Conventional Hydroelectric | 88 MW | 1956 | – |
| 13 | Conventional Hydroelectric | 88 MW | 1957 | – |
| 14 | Conventional Hydroelectric | 88 MW | 1957 | – |
| 15 | Conventional Hydroelectric | 88 MW | 1957 | – |
| 16 | Conventional Hydroelectric | 88 MW | 1957 | – |
| 5 | Conventional Hydroelectric | 88 MW | 1957 | – |
| 1 | Conventional Hydroelectric | 88 MW | 1958 | – |
| 2 | Conventional Hydroelectric | 88 MW | 1958 | – |
| 3 | Conventional Hydroelectric | 88 MW | 1958 | – |
| 4 | Conventional Hydroelectric | 88 MW | 1958 | – |
Questions
Chief Joseph, answered
How much power does Chief Joseph produce?
Chief Joseph has 2.5 GW of capacity from 27 generators. In 2025 it generated 9.8 TWh, 46% of the most it could have made running flat out all year (its capacity factor).
How many homes does Chief Joseph power?
Its 2025 output of 9.8 TWh equals the yearly electricity use of about 865,000 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Chief Joseph?
Chief Joseph is in Douglas County, Washington, at about 47.995°, -119.640°. The average electricity customer in Douglas County goes 2.8 hours a year without power, the 22nd most of 31 counties in Washington. The county's page has the full outage record.
Who operates Chief Joseph?
It is operated by USACE Northwestern Division (EIA sector: Electric Utility), and it feeds the Bonneville Power Administration.
When did Chief Joseph open?
Its oldest generator still running came online in 1955.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.