Wind power plant · Clark, KS
Cimarron Bend Wind Project II, LLC
Cimarron Bend Wind Project II, LLC is a 200 MW wind power plant in Clark County, Kansas, operated by Cimarron Bend Wind Project II, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 766 GWh, about what 73,000 average Kansas homes use in a year.
Cimarron Bend Wind Project II, LLC in context
Among the 52 wind plants in Kansas in the EIA's inventory, it is the 23rd largest, about 2.1% of the state's 9.7 GW of wind capacity.
Clark County has 4 power plants of 1 MW or more with 604 MW in all; Cimarron Bend Wind Project II, LLC is 33% of that and the 2nd largest of 3 wind plants there.
Its capacity factor of 44% in 2025 is higher than the 32% typical for wind plants across the US.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cimarron Bend Wind Project II, LLC (outlined) and other plants in Clark County, shaded. 37.355, -99.991.
Plant facts
- Operator
- Cimarron Bend Wind Project II, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Clark County, KS
- EIA plant ID
- 60688
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 200 MW | 2017 | – |
Nearby
Other plants in Clark County
Questions
Cimarron Bend Wind Project II, LLC, answered
How much power does Cimarron Bend Wind Project II, LLC produce?
Cimarron Bend Wind Project II, LLC has 200 MW of capacity from one generator. In 2025 it generated 766 GWh, 44% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cimarron Bend Wind Project II, LLC power?
Its 2025 output of 766 GWh equals the yearly electricity use of about 73,000 average Kansas homes (876 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cimarron Bend Wind Project II, LLC?
Cimarron Bend Wind Project II, LLC is in Clark County, Kansas, at about 37.355°, -99.991°. It is one of 4 power plants of 1 MW or more in the county.
Who operates Cimarron Bend Wind Project II, LLC?
It is operated by Cimarron Bend Wind Project II, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Cimarron Bend Wind Project II, LLC open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Kansas home's 876 kWh a month in 2025. Methodology.