Wind power plant · Gray, KS
Cimarron Windpower II
Cimarron Windpower II is a 131 MW wind power plant in Gray County, Kansas, operated by Deriva Energy. Its oldest generator still running came online in 2012. In 2025 it generated 437 GWh, about what 42,000 average Kansas homes use in a year.
Cimarron Windpower II in context
Among the 52 wind plants in Kansas in the EIA's inventory, it is the 38th largest, about 1.3% of the state's 9.7 GW of wind capacity.
Gray County has 4 power plants of 1 MW or more with 508 MW in all; Cimarron Windpower II is 26% of that and the 2nd largest of 4 wind plants there.
Its capacity factor of 38% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Gray County goes 7.7 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cimarron Windpower II (outlined) and other plants in Gray County, shaded. 37.901, -100.372.
Plant facts
- Operator
- Deriva Energy
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Gray County, KS
- EIA plant ID
- 57663
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 131 MW | 2012 | – |
Nearby
Other plants in Gray County
Questions
Cimarron Windpower II, answered
How much power does Cimarron Windpower II produce?
Cimarron Windpower II has 131 MW of capacity from one generator. In 2025 it generated 437 GWh, 38% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cimarron Windpower II power?
Its 2025 output of 437 GWh equals the yearly electricity use of about 42,000 average Kansas homes (876 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cimarron Windpower II?
Cimarron Windpower II is in Gray County, Kansas, at about 37.901°, -100.372°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Gray County goes 7.7 hours a year without power. The county's page has the full outage record.
Who operates Cimarron Windpower II?
It is operated by Deriva Energy (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Cimarron Windpower II open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Kansas home's 876 kWh a month in 2025. Methodology.