Wind power plant · Custer, MT
Clearwater Wind East
Clearwater Wind East is a 208 MW wind power plant in Custer County, Montana, operated by Portland General Electric Co. Its oldest generator still running came online in 2024. In 2025 it generated 830 GWh, about what 81,000 average Montana homes use in a year.
Clearwater Wind East in context
Among the 23 wind plants in Montana in the EIA's inventory, it is the 4th largest, about 9.7% of the state's 2.1 GW of wind capacity.
Custer County has 2 power plants of 1 MW or more with 231 MW in all; Clearwater Wind East is 90% of that.
Its capacity factor of 46% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Custer County goes 0.6 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Clearwater Wind East (outlined) and other plants in Custer County, shaded. 46.790, -106.002.
Plant facts
- Operator
- Portland General Electric Co
- Sector
- Electric Utility
- Grid operator
- NWMT
- County
- Custer County, MT
- EIA plant ID
- 66183
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CWE | Onshore Wind Turbine | 208 MW | 2024 | – |
Nearby
Other plants in Custer County
Questions
Clearwater Wind East, answered
How much power does Clearwater Wind East produce?
Clearwater Wind East has 208 MW of capacity from one generator. In 2025 it generated 830 GWh, 46% of the most it could have made running flat out all year (its capacity factor).
How many homes does Clearwater Wind East power?
Its 2025 output of 830 GWh equals the yearly electricity use of about 81,000 average Montana homes (853 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Clearwater Wind East?
Clearwater Wind East is in Custer County, Montana, at about 46.790°, -106.002°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Custer County goes 0.6 hours a year without power. The county's page has the full outage record.
Who operates Clearwater Wind East?
It is operated by Portland General Electric Co (EIA sector: Electric Utility), and it feeds balancing authority NWMT.
When did Clearwater Wind East open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Montana home's 853 kWh a month in 2025. Methodology.